Similar Projects
500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

500 North - Independence Avenue to 600 West - City of Provo
Alteration
Conception
$600,000 est. value
Provo, UT 84606

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

Harvey Well Deepening Project
Infrastructure
Design
$170,000 CJ est. value
Cedar Hills, UT 84062

Redwood Road Sewer- Grandview Blvd To Ring Rd
Infrastructure
Bidding
$150,000 CJ est. value
Saratoga Springs, UT 84045

2022 Pavilion Improvements Project
Demolition, New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Orem, UT 84057

Sanctuary
New Construction, Infrastructure
Sub-Bidding
$155,000,000 CJ est. value
Lehi, UT 84043

White Hills Well Test Pumping
Term Contract
Sub-Bidding
Eagle Mountain, UT 84005

Saratoga Dignity Care Assisted Living - Rebid
New Construction, Infrastructure - 61,420 SF
Post-Bid
$20,000,000 CJ est. value
Saratoga Springs, UT 84045

Harvest View Park Phase 2 - Site Construction
Renovation
Post-Bid
Santaquin, UT

Power Department Building
Results
Salem, UT 84653

Power Building Site Work
Results
Salem, UT 84653

American Fork Multifamily - Offsite Work
New Construction
Construction
American Fork, UT 84003

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

Red Bridge - Pid Super Pad
Alteration
Pending Verification
Orem, UT

Last Updated 08/08/2022 08:36 AM
Project Title

Rock Canyon Aquifer Storage Booster Station

Physical Address View project details and contacts
City, State (County) Provo, UT 84601   (Utah County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Concrete, Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $12,987,039 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 08th, 2022, project has not been awarded yet. No timeline of award was established. Work generally includes pump station construction including, mechanical, electrical, plumbing, structural, architectural and civil. Installing connection to existing system. Commissioning new pumphouse. Decommissioning existing pumphouse. Restoring landscape after construction. Question Submission Close Date 7/7/2022 4:00 PM MDT

Details

Division 02 - Existing Conditions, Physical Decontamination, Mechanical Filtration Decontamination.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents