Similar Projects
SIMMS - Multimodal Transportation Center - SP1002 - City of Carbondale
New Construction, Infrastructure
Conception
$8,541,000 CJ est. value
Carbondale, IL 62901

Cherry Street/Elm Street Storm Sewer Interceptor Replacement - SS1002- City of Carbondale
Infrastructure
Conception
$675,000 CJ est. value
Carbondale, IL 62901

Southern Illinois University Carbondale - Communications Building Renovations & Additions
Addition, Demolition, Build-out, Infrastructure - 289,050 SF
Design
$84,000,000 CJ est. value
Carbondale, IL 62901

Installation of Median Crossovers for the Eastbound Lanes of IL 13
Infrastructure
Bidding
$500,000 CJ est. value
Murphysboro, IL 62966

Installation of Median Crossovers for the Eastbound Lanes of IL 13
Infrastructure
Bidding
$500,000 CJ est. value
Murphysboro, IL 62966

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Future Lane Improvements
Infrastructure
Results
$253,041 est. value
Murphysboro, IL 62966

3 Water Main Relocation at 9 Mile Creek Bridge
Infrastructure
Results
$211,300 est. value
Carbondale, IL

Feeder Watermain Replacements (Chautauqua - Oakland to Water Tower - 2,300 feet) -WS1302 - City of Carbondale
Infrastructure
Conception
$460,000 CJ est. value
Carbondale, IL 62901

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Patching on at Various Locations on US 51 and IL 13
Infrastructure
Results
IL

Cedar Lake Shoreline and Gully Stabilization - Phase 3-WS1503- City of Carbondale
Infrastructure
Conception
$1,000,000 CJ est. value
Carbondale, IL 62901

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Resurfacing, HMA Shoulders, Pavement Markings, and Raised Reflective Markers on Elkville Road from IL 127 to Haulage Road
Infrastructure
Results
IL

Last Updated 07/24/2023 12:07 PM
Project Title

Marberry Arboretum Trails and Parking Lot - Phase I

Physical Address View project details and contacts
City, State (County) Carbondale, IL 62902   (Jackson County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Misc. Recreational, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of construction of a new parking lot with HMA and/or concrete pavements including an accessible parking stall, ADA compliant curb ramp, sidewalk, storm sewers, accessible pre-engineered pit toilet, and electric service & lighting for new parking lot. A pre-bid conference is not planned at this time. Technical questions regarding interpretations of the bidding documents shall be directed to Sean C. Henry, P.E. of Klingner & Associates, P.C. at (618) 331-4050; shenry@klingner.com NOT City Blue Technologies. All proposals shall be accompanied by either a bid bond on the "Proposal Bid Bond" form contained in the proposal, executed by a corporate surety company satisfactory to the Carbondale Park District, or a bank cashier's check, an irrevocable letter of credit or a properly certified check payable to the Carbondale Park District for not less than 5 percent (5%) of the amount bid, or for the amount listed in the specifications. The Carbondale Park District reserves the right to reject any or all proposals and to waive technicalities, and reserves the right to determine the qualifications of any and all contractors to perform the work required under this contract. No bid may be withdrawn after the time for opening of the bids is past. The Carbondale Park District is an Equal Opportunity Employer and encourages minority group participation in the bidding and construction process. Bidders are notified that not less than the prevailing wage rate as determined by the Illinois Department of Labor shall be paid to all workmen performing work under this contract.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents