Similar Projects
Speedway #8832
New Construction - 4,600 SF
Conception
Rochester Hills, MI 48307

Speedway #8832
New Construction - 4,600 SF
Conception
Rochester Hills, MI 48307

Sakura Asian Village
New Construction - 47,477 SF
Design
$50,000,000 to $60,000,000 est. value
Novi, MI 48375

Kroger #721
Renovation, Addition - 29,950 SF
Design
Pinckney, MI 48169

Kroger #D615
Renovation, Addition - 47,708 SF
Bidding
Livonia, MI 48152

Meijer #158 - 2021 Mi9 Curbside
Addition - 1,700 SF
Bidding
Grand Rapids, MI 49525

Kroger #688-05
Renovation - 46,000 SF
Post-Bid
$2,000,000 est. value
Ann Arbor, MI 48103

Sam's Club #6664-221 - GS
Renovation
Post-Bid
Utica, MI 48315

SAR; Frmr Wesson Filling Station - Remedial Invest
Renovation
Results
Detroit, MI

DPS Vactor Pad and Washbay Project
Renovation
Results
Rochester Hills, MI

Kroger #458-05
Renovation
Construction
Brownstown Township, Flat Rock, MI 48134

Kroger #649-04
Renovation
Construction
$1,200,000 est. value
Lake Orion, MI 48359

Gas Station - Addition
Renovation, Addition - 592 SF
Pending Verification
Detroit, MI 48221

Marathon Gas Station - Addition and Renovation
Renovation, Addition - 2,290 SF
Pending Verification
Commerce Township, MI 48382

Gas Station & Convenience Store
New Construction
Conception
Walker, MI 49544

Reported 12/01/2021 12:00 AM
Project Title

Kwik Trip #1183

Physical Address View project details and contacts
City, State (County) Bessemer, MI 49911   (Gogebic County)
Category(s) Commercial
Sub-Category(s) Car Wash, Gas Station, Supermarket/Convenience Store
Contracting Method Bids by Invitation.
Project Status Bidding, Construction Start Expected May 2022, Construction Completion Expected August 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Car Wash, New Construction, Gas Station, New Construction, 1 Supermarket/Convenience Store, 9,110 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents