Similar Projects
Midtown Park Front 90 Plaza and Garage Improvements
Renovation
Bidding
Houston, TX 77006

EL Jardin Beach Park Improvements
Renovation
Bidding
Pasadena, TX 77502

Elsik 9th Grade Center New Competition Softball Field
Post-Bid
Less than $350,000 est. value
Houston, TX 77072

168 Park Improvements - Phase 1
Post-Bid
TX

2019 Baseball and Softball Field Renovations CY Falls CY Ranch CY Ridge and CY Woods High School
Results
Less than $4,000,000 est. value
Cypress, TX 77429

Cutten Green Park
Results
TX

North Hardy Commerce Park Drainage
Post-Bid
Houston, TX 77000

Deerwood Trail/Path from Westheimer Road to Terry Hershey Hike and Bike Trail
Results
$1,000,000 to $2,000,000 est. value
Houston, TX 77077

Groves Sections 35 and 36 Park and Reserves
Post-Bid
TX

Renovation and Construction at James Driver Inclusive Park, Precinct 2
Results
Houston, TX 77093

Cougar Village Outdoor Space
New Construction
Post-Bid
Houston, TX

Groves Sections 13 & 29 Park and Reserves
Results
Humble, TX

Pyburn Elementary School Replacement Galena Park
New Construction
Post-Bid
Houston, TX 77015

Southern Downtown Park
Results
Houston, TX 77010

Playground and Outdoor Equipment
Term Contract
Post-Bid
TX

Last Updated 12/01/2021 10:50 AM
Project Title

District Wide Playground Services

Physical Address View project details and contacts
City, State (County) Aldine, TX   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes playground services in support of playground equipment jobs as needed throughout the District allowing facilities and schools to adequately be serviced as needed by replacing old and damaged playground equipment, border edging, access curb ramp, fall surfacing system and subsurface drainage system as Aldine ISD requires and other work normally performed by a playground Contractor. The scope also includes removing and installing an individual replacement component. A full unit replacement or installation by playground contractor includes the play equipment, border edging, access curb ramp, fall surface of engineered wood chips with geo fabric, and subsurface drainage system. Demolition for full unit replacement; including border edging, access curb ramp and fall surfacing system for a full unit will be provided by Owner.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents