Similar Projects
Sewer Improvements - County of Lake
Infrastructure
Conception
$25,000,000 est. value
Crown Point, IN

Bridge over Norfolk Southern
New Construction, Infrastructure
Conception
$5,013,000 CJ est. value
Hammond, IN 46324

Tailor Row
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Hammond, IN 46320

Subdivision - Goodwill Store
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Crown Point, IN 46307

Bridge Deck Overlay - SR 55
Infrastructure
Bidding
$430,179 CJ est. value
Crown Point, IN 46307

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Lake George Canal Middle Section Restoration, Lake County, Indiana
Results
$10,000,000 to $25,000,000 est. value
IN

East Side Transmission Water Main
Infrastructure
Results
$1,105,394 est. value
Cedar Lake, IN

New Administration Center, Alternative Education and Resource Center and Related Work
New Construction, Infrastructure
Construction
$19,869,043 CJ est. value
Crown Point, IN 46307

2022 CCMG Street Improvement Project
Infrastructure
Construction
$1,533,684 CJ est. value
Highland, IN 46322

St. John Commons
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Dyer, IN 46311

Rise and Shine Car Wash - Crown Point
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Crown Point, IN 46307

Bid Package #3 - Additions and Renovations to Bibich Elementary - Mechanical/Electrical Package
Addition, Demolition, Renovation, Infrastructure
Design
$3,238,550 CJ est. value
Dyer, IN 46311

119th Street Alley Water Main - New York Avenue to Ohio/Schrage Avenue Project
Infrastructure
Post-Bid
Whiting, IN 46394

Last Updated 07/21/2023 11:31 PM
Project Title

Small Structure Replacement and Pipe Lining

Physical Address View project details and contacts
City, State (County) Monticello, IN 47960   (White County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $2,796,253 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract : B -43726-C Project Control No. 1700035 ,1701450 ,1701507 Federal/State No. 1700035 ,1701450 ,1701507 DBE Goal: 11.00 Small Structure Pipe Lining Cv 039-091-127.70 Culvert White County - on Sr 39, 1.94 Miles South of Sr 16 (Rp 127+0070) Small Structure Replacement Cv 421-091-168.80 Culvert White County - on Us 421 Over Unt to Fraiser Ditch at Cr W 100n (Rp 168+0008) Small Structure Replacement Cv 039-091-129.10 Culvert White County - on Sr 39 Over Unt to Tippecanoe River, 0.46 Mile S of Sr 16 (Rp 129+0001) Contractors desiring to submit electronic bids via Electronically must register with INDOT as a valid bidder by submitting the form provided on the INDOT Letting Information internet page. Failure to register will cause failure of the Electronic bid submission process. A bidder may request valid bidder status by submitting the bidder registration form until 9:00 AM on the bid opening date. An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids INDOT - Call 691 - Small Structure Replacement and Pipe Lining - SR 39

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents