Similar Projects
Crescent Harbor Elementary School
New Construction
Conception
$68,000,000 est. value
Oak Harbor, WA 98277

Oak Harbor Elementary School
New Construction
Conception
$75,000,000 est. value
Oak Harbor, WA 98277

Early Learning Center - Heritage University
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Toppenish, WA 98948

Early Learning Center
Renovation
Design
$800,000 CJ est. value
Bellevue, WA 98007

Video Surveillance Project
Renovation
Bidding
$405,000 CJ est. value
Randle, WA 98377

Heritage High School Parking Lot Rehabilitation
Infrastructure
Bidding
$450,000 CJ est. value
Vancouver, WA 98682

Illahee Middle School - STAGE 1 BIDDING: Tuesday, 4/25/2023 @ 1:00 pm
Demolition, New Construction, Renovation, Infrastructure - 105,000 SF
Sub-Bidding
$66,000,000 CJ est. value
Federal Way, WA 98003

Inspection and Material Testing Pasco School
Term Contract
Sub-Bidding
Pasco, WA 99301

Design Build Service Bryant Montessori K 8 School Replacement
New Construction
Post-Bid
$31,500,000 est. value
Tacoma, WA

Chinook Elementary School Replacement
Renovation
Post-Bid
Vancouver, WA 98685

General Contractor/Construction Manager Services for John Rogers Elementary Replacement Project
New Construction - 82,000 SF
Results
$58,000,000 est. value
Seattle, WA 98125

North Queen Anne School
Renovation
Results
Seattle, WA 98134

East Olympia Elementary School (EOE) / (THES) Tumwater Hill Elementary School Illness Room Renovation Projects
Renovation
Construction
$173,938 CJ est. value
Tumwater, WA 98501

Longview School District Security Vestibule Project Phase II
Renovation
Construction
$525,258 CJ est. value
Longview, WA 98632

Sunnyland Elementary School
Renovation, Addition
Pending Verification
Bellingham, WA 98225

Last Updated 04/11/2023 02:35 PM
Project Title

Carl Cozier Elementary School Replacement - Bellingham School District No. 501

Physical Address View project details and contacts
City, State (County) Bellingham, WA 98225   (Whatcom County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $12,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A bond was passed in 2022 to begin the design for the replacement of Carl Cozier Elementary. A future bond is to fund the construction. Per the owner, as of April 11, 2023, they are still working through the project schedule and have yet selected a design team. the owner states that the hope is to have a design team selected towards the end of summer 2023.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents