Similar Projects
Repair or Replace Force Main Lift Station 8 - City of Emporia
Renovation, Infrastructure
Conception
$1,000,000 CJ est. value
Emporia, KS 66801

Realign Sewer Main Along South Avenue - City of Emporia
Infrastructure
Conception
$4,000,000 CJ est. value
Emporia, KS 66801

David Traylor Zoo North American River Otter Exhibit
Addition, Infrastructure
Design
$1,000,000 CJ est. value
Emporia, KS 66801

Bald Eagle Pond Renovation
Infrastructure
Bidding
$550,000 CJ est. value
Emporia, KS 66801

Bald Eagle Pond Renovation
Infrastructure
Bidding
$550,000 CJ est. value
Emporia, KS 66801

Pin Tail March Rehab
Infrastructure
Post-Bid
$150,000 CJ est. value
Hartford, KS 66854

Pin Tail March Rehab
Infrastructure
Post-Bid
$150,000 CJ est. value
Hartford, KS 66854

Cleaning, Repairing, & Painting & Internal Mixing System 1,000,000-Gallon Elevated Reservoir 12th Avenue Tower
Renovation, Infrastructure
Results
$684,385 CJ est. value
Emporia, KS 66801

Industrial Park IV Road Improvements (Road F from Highway 50 to Road 180)
Infrastructure
Results
$2,034,510 CJ est. value
Emporia, KS 66801

David Traylor Zoo Education Center Expansion and Renovation
Addition, Renovation, Infrastructure
Construction
$1,000,000 CJ est. value
Emporia, KS 66801

St. Joseph Catholic Church - Parish Center
Demolition, New Construction, Infrastructure - 6,670 SF
Construction
$1,400,000 CJ est. value
Olpe, KS 66865

Watermain Project Lincoln - 24th to Briarcliff - City of Emporia
Infrastructure
Conception
$575,000 CJ est. value
Emporia, KS 66801

Industrial Park III Watermain Improvements (Penny Lane, South Ave & Road M5)
Infrastructure
Bidding
$260,000 CJ est. value
Emporia, KS 66801

Emporia Water Meter Installation, Meter GPS, and Lead and Galvanized Service Line Survey
Infrastructure
Post-Bid
$670,000 CJ est. value
Emporia, KS 66801

Watermain Project South East Trans - West to Neosho to South - City of Emporia
Infrastructure
Conception
$1,940,000 CJ est. value
Emporia, KS 66801

Last Updated 02/14/2024 10:13 AM
Project Title

Stormwater Pond Improvements to Serve Lots 1, 2 and 6

Physical Address View project details and contacts
City, State (County) Emporia, KS 66801   (Lyon County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $99,735 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work for the Pond Drainage Project will consist of the approximate quantities: Base Bid Add Alternate No. 1 Bid Lower 12" PVC Outlet Pipe Up To 12" in Elevation 1 L.S. Mobilization 1 L.S. Clearing & Grubbing 1 L.S. Unclassified Pond Excavation 1 L.S. Temporary Construction Entrance 1 Ea. Inlet Sediment Barrier 2 Ea. Sediment Removal (Set Price) 1 C.Y. Silt Fence Slope Barrier 100 L.F. Permanent Seeding, Fertilizer, & Mulching 1 L.S Each bid shall be accompanied by a certified check, a cashier's check, or an approved bidder's bond in an amount of not less than five percent (5%) of the total amount of the bid. Any bid bond must be with a surety and guaranty company authorized to do business in the State of Kansas and acceptable to the City as Surety. The Bidder to whom the Contract is awarded will be required to furnish statutory bond in the amount of one hundred percent (100%) of the Contract, and performance and maintenance bond in the amount of one hundred percent (100%) of the Contract; the bonds to be acceptable to the City of Emporia, Kansas, and conform to the requirements of the Contract documents. The City of Emporia, Kansas, reserves the right to reject any or all bids and to waive defects in bids. No bids will be withdrawn for a period of sixty (60) days after the time set for opening of bids. If you need accommodations due to a disability to participate in this event, meeting, or activity, or alternative format of written materials contact the City of Emporia, City Manager's Office at least 48 hours before the event at 620-343-4250 or e-mail emporiainfo@emporiaks.gov

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents