Similar Projects
Southern Research Biotech Building
Demolition, New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Birmingham, AL 35203

TCVC Residential Senior Development / Knox Square Active Adult Complex
New Construction, Infrastructure
Design
$68,000,000 CJ est. value
Hoover, AL 35244

JCDH Public Health Pavilion
Addition, New Construction, Infrastructure, Renovation
Bidding
$438,000 CJ est. value
Birmingham, AL 35233

JCDH Public Health Pavilion
Addition, New Construction, Infrastructure, Renovation
Bidding
$438,000 CJ est. value
Birmingham, AL 35233

Installation of Water Mains and Appurtenances
Post-Bid
Birmingham, AL

Installation of Water Mains and Appurtenances
Post-Bid
Fultondale, AL 35068

Ruffner Park Revitalization Phase I
Infrastructure
Results
Irondale, AL 35210

Installation of Water Mains and Appurtenances Connected there to and 71 Water Services
Infrastructure
Results
$647,315 est. value
Birmingham, AL 35211

Samford University Recreation Center and Athletic Complex
New Construction, Infrastructure - 154,000 SF
Pending Verification
$30,000,000 CJ est. value
Birmingham, AL 35229

Douglas Commons
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Hoover, AL 35226

Douglas Commons Lot 1
New Construction, Infrastructure - 5,000 SF
Design
$1,400,000 CJ est. value
Birmingham, AL 35226

UAB Express Lot 1 DC Quick-Charge EV Charging Stations
New Construction, Infrastructure
Bidding
$250,000 CJ est. value
Birmingham, AL 35233

Installation of Water Mains and Appurtenances
Post-Bid
Birmingham, AL 35232

Installation of Water Mains and Appurtenances Connected there to and 125 Water Services
Infrastructure
Results
$441,034 est. value
Birmingham, AL 35232

Parkside Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Birmingham, AL 35233

Last Updated 08/23/2022 12:35 PM
Project Title

Natural Gas Facilities Replacement

Physical Address View project details and contacts
City, State (County) Graysville, AL 35073   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $458,185 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work shall include the installation of the following approximate items of work and quantities of these items: SECTION 1: 2" PE Pipe, 27,075 L.F.; 1- 1/4" PE Pipe, 15 L.F.; 1" PE Pipe, 160 L.F.; 3/4 " PE Service Line, 2,045 L.F.; 1/2 " PE Service Line, 8,000 L.F.; 2" PE Valves, 32 Each; 2" Bores, 4,315 L.F.; Service Bores, 1,800 L.F.; 2" PE to 2" PE Connections, 17 Each; 2" PE to 1-1/4" PE Connections, 4 Each; 2" PE to 2- 1/4" C.I. Connections, 1 Each; 2" PE to 2" Steel Connections, 6 Each; 2" Steel Line Stopper Fittings, 5 Each; Service Reconnections, 41 Each; Service Replacements. The Owner reserves the right to reject any or all bids and to waive any or all informalities and technicalities therein. No Bidder will be allowed to withdraw his Bid, without Owner's consent, for a period of sixty (60) days after the date of actual bid opening. Each Bidder shall be a licensed Contractor in accordance with the regulations of the State of Alabama and must include the license number, expiration date and classification on the outside of the sealed bid envelope.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents