Similar Projects
Amazon Sortation Facility - Project Oak / Atlanta
New Construction, Infrastructure - 3,200,000 SF
Design
$300,000,000 CJ est. value
Emerson, GA 30137

Amazon Sortation Facility - Project Oak / Atlanta
New Construction, Infrastructure - 3,200,000 SF
Design
$300,000,000 CJ est. value
Emerson, GA 30137

RFP D/B - Wilderness Camp Mountain Bike Trail Phase I
Infrastructure
Bidding
$200,000 CJ est. value
White, GA 30184

RFP D/B - Wilderness Camp Mountain Bike Trail Phase I
Infrastructure
Bidding
$200,000 CJ est. value
White, GA 30184

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Chitwood Cove Road Water Relocation
Infrastructure
Results
$650,000 est. value
GA

Health Department Renovation and Expansion
Addition, Demolition, Renovation, Infrastructure
Results
$5,199,000 CJ est. value
Cartersville, GA 30121

South & Twenty Apartments
New Construction - 2,055,371 SF
Construction
$10,000,000 CJ est. value
Cartersville, GA 30121

South & Twenty Apartments
New Construction - 2,055,371 SF
Construction
$10,000,000 CJ est. value
Cartersville, GA 30121

North Bartow Interchange Feasibility Study (New I75 interchange) - Bartow County
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cartersville, GA 30120

North Bartow Interchange Feasibility Study (New I75 interchange) - Bartow County
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cartersville, GA 30120

SR 3 / US 41 SB at SR 293 / CSX #340429d in Emerson
Demolition, New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Cartersville, GA 30121

Tennis Court Resurfacing and Court Construction
Infrastructure
Bidding
$150,000 CJ est. value
Cartersville, GA 30120

Art House Deck Expansion and Kiln Room Addition
Renovation
Post-Bid
$200,000 est. value
Acworth, GA

Last Updated 08/07/2023 06:07 PM
Project Title

Leo Cottages / Cartersville

Physical Address View project details and contacts
City, State (County) Cartersville, GA 30120   (Bartow County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential, Sewer and Water
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Fitness Center, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Swimming Pool(s), Water Lines
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $87,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 07, 2023, A general contractor has been awarded. Groundbreaking and Sitework started back in June 2023, and building construction could start sometime 1st of next year 2024. The scope of this project includes, but is not limited to, the following: site work, paving and new construction of a community center/fitness / recreation center with a side walk and parking lot.. The trades being sought on this project include: earthwork, storm drainage and utilities, termite control, hardscape, landscaping, paving, concrete foundations, gypsum concrete, misc. metal fabrications, wood stairs, handrails and railings, wood framing, wood floor and roof trusses, interior millwork, insulation, asphalt shingles, fiber cement siding, waterproofing, caulking and sealants, doors and frames, garage doors, vinyl windows, storefront openings, door hardware, glazing, gypsum wallboard assemblies, ceramic tile, vinyl plank, carpet, painting, miscellaneous building accessories, bathroom accessories, mailboxes, residential equipment, residential casework, window treatments, swimming pool, plumbing systems, mechanical systems and electrical systems. The project is located in Cartersville, GA. The project consists of 246 cottage/townhome/apartment units located in (117) residential buildings. The project also includes a clubhouse, fitness, poolhouse, maintenance and other amenities.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents