Similar Projects
Combes Community Trail Project
Bidding
Less than $200,000 est. value
Combes, TX 78552

Pomona Parkway Pedestrian Crosswalks
Bidding
Manvel, TX 77578

Construction of Sidewalk, Planting and Irrigation
Post-Bid
Bastrop, TX

Degree Parking on Canal Street at Lopez-Riggins Elementary School
Post-Bid
Los Fresnos, TX 78566

Frisco Ranch Amenity Pond Improvements
Results
$350,000 est. value
Frisco, TX 75034

911 Call Center Parking Lot
Results
Less than $148,797 est. value
Belton, TX 76513

Brazoria Paving Parking Lot
Bidding
$45,000 to $60,000 est. value
Freeport, TX 77541

Seeling Channel Phase 3 Project
Post-Bid
$15,080,000 est. value
San Antonio, TX 78205

Justice Center Parking Lot
Results
Less than $130,500 est. value
Belton, TX 76513

White Rock Lake Trail - Bath House to Winfrey Point
Infrastructure
Bidding
Dallas, TX 75295

Parking Lot Expansion - ESC
Post-Bid
Wylie, TX 75098

Francis Drive Rehabilitation Phase 1 and 2
Results
$3,000,000 est. value
College Station, TX 77840

2021 Richwood Street Improvements
Alteration
Bidding
Richwood, TX

Pleasanton Header Curb
Post-Bid
Pleasanton, TX 78064

Battlefield Extension Project
Results
Brownsville, TX 78520

Last Updated 05/14/2021 03:33 PM
Project Title

Eastgate Neighborhood Sidewalk and Southwood Sidewalk Improvements Project

Physical Address View project details and contacts
City, State (County) College Station, TX 77844   (Brazos County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is a combination of two sidewalk improvement projects. One along Southwood Drive between Valley View Drive and Todd Trail and one within the Eastgate Neighborhood area from James Parkway to Lincoln Avenue. Eastgate Neighborhood area Sidewalk Project shall be substantially complete first before the Southwood Sidewalk Project begins.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents