Similar Projects
Sora Wellness Assisted Living
New Construction - 40,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Bluffton, SC

New Riverside Park / Barn Site - 00085 - Town of Bluffton
Infrastructure
Conception
$3,872,112 CJ est. value
Bluffton, SC 29909

Spencer's Trail
New Construction
Design
Anderson, SC

Grace Episcopal Church Parish Hall
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Charleston, SC 29401

Water System Improvements FY 21
Infrastructure
Bidding
$420,000 CJ est. value
Calhoun Falls, SC 29628

Intersection Improvements - SC 19 (Aiken Co)
Infrastructure
Bidding
$5,033,512 CJ est. value
Aiken, SC 29801

Pavement Markings - District 2
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Anderson, SC 29621

RSFH Berkeley Campus Expansion, MEP TRADES ONLY
Addition, Demolition, Infrastructure - 282,000 SF
Sub-Bidding
$40,000,000 CJ est. value
Summerville, SC 29486

Sitework Package for Highland Springs Elementary/Middle School - Phase 1
Infrastructure
Post-Bid
North Augusta, SC 29841

FLETC Training Venue Replication
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
North Charleston, SC 29405

Construction of Azalea Fuel Facility
New Construction, Infrastructure
Results
$13,906,000 CJ est. value
North Charleston, SC 29405

Area 1 Detention Pond Clearing Project
Infrastructure
Results
SC

Spinx #368 / Charleston
New Construction, Infrastructure - 4,000 SF
Construction
$3,000,000 CJ est. value
Charleston, SC 29401

Public Storage
New Construction, Demolition - 44,919 SF
Construction
Charleston, SC 29414

Christian Brothers - Charleston
New Construction, Infrastructure - 5,500 SF
Pending Verification
$1,250,000 CJ est. value
Charleston, SC 29412

Last Updated 09/26/2022 11:41 AM
Project Title

KershawHealth Karesh Long Term Care - The Health Services District of Kershaw County

Physical Address View project details and contacts
City, State (County) Camden, SC 29020   (Kershaw County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Assisted Living Facility, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2021
Bids Due View project details and contacts
Estimated Value $34,568,758 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new long term facility for Kershaw county. A more detailed scope is expected to be released in the near future. As of July 27, 2020, this project is in the conceptual phase. The certificate of need has been passed by South Carolina Department of Health and Environmental Control. Information regarding design team and contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

87,690 SF. Addition, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents