Similar Projects
Candy Cane Lake Bulkhead Repair
Bidding
Jacksonville, FL

Desilt Box Culverts with Repairs
Bidding
$750,000 est. value

Bassanova Court Underdrains
Post-Bid
Jacksonville, FL 32209

San Jose Boulevard Drainage Improvement
Post-Bid
Jacksonville, FL 32214

Willow Branch Canal Rehabilitation
Results
Less than $831,115 est. value
Jacksonville, FL

Romilly Drive Drainage Improvement Project
Results
Less than $92,554 est. value
Jacksonville, FL

Aluminized Metal Pipe
Bidding
Jacksonville, FL

Roadside Ditch Cleaning and Rehabilitation - Pre-Qualified Horizontal Construction
Term Contract
Results
Less than $1,069,547 est. value
Jacksonville, FL 32202

AASF #1 Erosion Remediation
Results
$325,000 to $400,000 est. value
Jacksonville, FL 32221

Dredged Material Management Area Du-2 and SJ-1 Shoreline Improvements
Results
Less than $1,467,747 est. value

Cedar Forest Drive Drainage Improvement Project
Results
Less than $141,112 est. value
Jacksonville, FL 32210

Philrose Drive Drainage Improvement Project
Results
Less than $93,140 est. value
Jacksonville, FL 32202

Clean and Desilt Box Culverts
Results
Less than $250,000 est. value

Duval County Beach Tilling
Results
Less than $49,494 est. value
Jacksonville, FL 32202

Reservoir Lane Underdrain Improvement Project
Results
Less than $99,940 est. value
Jacksonville, FL 32202

Last Updated 03/11/2020 12:35 PM
Project Title

Sunbeam Road at Abbey Glen Circle Drainage Improvements

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32202   (Duval County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $185,395
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of furnishing all labor, materials, and equipment and performing all operations necessary for installation of underdrain along the northern side of Sunbeam Road between Lenox Avenue and Normandy Blvd. The work includes, but is not limited to sidewalk & driveway construction, asphalt removal & replacement, drainage removal, drainage construction, curb and gutter, utility adjustments, sodding, dewatering, maintenance of traffic, erosion control and pollution abatement, etc.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents