Similar Projects
New Downtown Center And Plaza Park - City Of Corning
New Construction, Infrastructure - 15,000 SF
Conception
$8,500,000 CJ est. value
Corning, CA 96021

Place HMA (Type A) Overlay
Infrastructure
Post-Bid
$1,400,000 est. value
CA

Asphalt-Rubber Binder, Seal Coat and Replace Asphalt Concrete Surfacing
Infrastructure
Post-Bid
$950,000 est. value
CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Place Hot Mix Asphalt (Type A) and Replace AC Surfacing
Infrastructure
Results
$1,500,000 est. value
CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Place HMA (Type A) and Replace AC Surfacing
Infrastructure
Results
$1,330,000 est. value
CA

A New Gymnasium and Cafe for West Street Elementary School
New Construction, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Corning, CA 96021

Corning High School Shade Structure
Infrastructure
Results
$554,613 CJ est. value
Corning, CA 96021

(2) New PC Portable Classrooms at Lassen View Elementary School
New Construction, Infrastructure
Post-Bid
$345,000 CJ est. value
Los Molinos, CA 96055

Jennings Heights Subdivision Road Maintenance and Rehabilitation Project
Infrastructure
Results
$431,680 CJ est. value
Corning, CA 96021

Corning High School Football Field Renovation
Infrastructure
Post-Bid
$200,000 CJ est. value
Corning, CA 96021

Construction on State Highway Route 36
Infrastructure
Post-Bid
$15,800,000 CJ est. value
Red Bluff, CA 96080

Last Updated 03/09/2023 04:35 AM
Project Title

Red Bluff Municipal Airport

Physical Address View project details and contacts
City, State (County) Red Bluff, CA 96080   (Tehama County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $247,338 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Schedule I - Rehabilitate Aircraft Parking Apron

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents