Similar Projects
Glenwood Children Park Arch Repair
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Madison, WI 53711

Roof Replacement
Infrastructure
Sub-Bidding
$425,000 CJ est. value
Madison, WI 53715

Replace Roofs at William S. Middleton Memorial Veterans Hospital
Renovation
Post-Bid
$500,000 CJ est. value
Madison, WI 53705

Roof Replacement at Engineering Hall - GPC
Alteration
Results
$1,768,000 est. value
Madison, WI

Courthouse Descent System Anchorage
Alteration
Results
Madison, WI 53703

Roof Replacement MEP
Renovation
Construction
$1,245,332 CJ est. value
Madison, WI 53706

Fire Station Re-Roof
Renovation
Sub-Bidding
$190,841 CJ est. value
Cross Plains, WI 53528

Camp Randall Partial Roof Replacement
Alteration
Results
$650,000 est. value
Madison, WI 53711

Streets West Badger - Roofing Alterations
Alteration
Results
$45,000 est. value
Madison, WI 53713

Courthouse Roof Replacement
Alteration
Results
$500,000 est. value
Madison, WI 53703

Madison College - Commercial Avenue Building B Partial Roof Rehabilitation
Alteration
Results
$420,000 est. value
Madison, WI 53704

Salt Shed Roof Replacement
Alteration
Results
$400,000 est. value
Middleton, WI 53562

Shelter 1 Roof Replacement - Token Creek County Park
Renovation
Results
$85,102 CJ est. value
Deforest, WI 53532

Roof Replacement Cole hall
Renovation
Results
$350,000 CJ est. value
Madison, WI 53706

NSWTP Maintenance Facility Rooftop Solar Expansion
Renovation
Results
$244,423 CJ est. value
Madison, WI 53713

Last Updated 06/21/2023 08:09 AM
Project Title

Replace Roof Mates - Fort Mccoy

Physical Address View project details and contacts
City, State (County) Madison, WI 53715   (Dane County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $315,392 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

THIS PROJECT IS BEING LET USING THE SINGLE PRIME BIDDING AND CONTRACTING PROCESS. DFD WILL PUBLICLY BID THE APPLICABLE MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION (MEP) DIVISIONS OF WORK FIRST. WITHIN 5 DAYS OF THE MEP BID OPENING, DFD WILL IDENTIFY A LOWEST, QUALIFIED, RESPONSIBLE, CERTIFIED BIDDER IN EACH APPLICABLE MEP DIVISION OF WORK. THESE SUCCESSFUL MEP BIDS MUST BE INCLUDED IN ALL GENERAL PRIME CONTRACTOR BIDS RECEIVED. NO LATER THAN 5 DAYS AFTER DFD IDENTIFIES THE SUCCESSFUL MEP BIDS, DFD WILL PUBLICLY OPEN GENERAL PRIME CONTRACTOR BIDS. GENERAL PRIME CONTRACTOR BIDS THAT DO NOT INCLUDE THE SUCCESSFUL MEP BIDS WILL BE REJECTED. THE STATE WILL ENTER INTO A SINGLE CONTRACT WITH THE LOWEST, QUALIFIED, RESPONSIBLE, CERTIFIED GENERAL PRIME CONTRACTOR AND THIS GENERAL PRIME CONTRACTOR WILL ENTER INTO SUBCONTRACTS WITH THE SUCCESSFUL MEP BIDDERS. IF A PROJECT DOES NOT INCLUDE ANY MECHANICAL, ELECTRICAL, PLUMBING, OR FIRE PROTECTION DIVISIONS OF WORK, DFD WILL BID ONE BID PACKAGE FOR ALL WORK TO GENERAL PRIME CONTRACTORS. PDF SCANNED FILE OF ALL REQUIRED BID DOCUMENTS, INCLUDING BID AND BID BOND FORMS WITH ORIGINAL WET SIGNATURES OR PROPERLY TRANSMITTED ELECTRONIC SIGNATURES (ONLY PDF FILES WILL BE ACCEPTED) EMAILED TO DOADFDMBIDSUBMISSION@WISCONSIN.GOV (THIS IS THE PREFERRED METHOD); ADDITIONAL PROJECT BIDDING INFORMATION, INCLUDING PLAN HOLDERS LISTS ARE AVAILABLE ON THE DIVISION OF FACILITIES DEVELOPMENT PUBLIC WEBSITE AFTER OPENING THE WEB PAGE, SELECT CURRENT CONSTRUCTION PROJECT BIDDING OPPORTUNITIES AT THE BOTTOM OF THE SCREEN. BIDDER SHALL IDENTIFY THE DIVISION OF WORK THEY ARE BIDDING ON WHEN REQUESTING BIDDING DOCUMENTS ONLINE. NO DEPOSIT IS REQUIRED TO OBTAIN DOCUMENTS FOR BIDDING PURPOSES. THE 2017-2019 WISCONSIN STATE BUDGET (2017 WISCONSIN ACT 59) REPEALED WISCONSIN'S PREVAILING WAGE LAWS. EFFECTIVE SEPTEMBER 23, 2017, STATE PREVAILING WAGE REQUIREMENTS ON STATE BUILDING PROJECTS NO LONGER APPLY. THESE CHANGES TAKE EFFECT FOR PROJECTS ADVERTISED FOR BID AFTER SEPTEMBER 23, 2017. THIS CHANGE DOES NOT AFFECT THE FEDERAL DAVIS BACON ACT REQUIREMENT

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents