Similar Projects
Cline and Reiley Elementary Schools
New Construction, Renovation, Alteration
Conception
Alexandria, Cold Spring, KY 41076

Security Vestibules Phase II
Renovation
Bidding
Jeffersontown, Louisville, KY 40204

Beechwood Independent Schools Phase 6B: Addition and Renovation
Renovation, Addition
Bidding
Fort Mitchell, KY 41017

Boiler Replacement at Wellington Elementary School
Post-Bid
Louisville, KY 40216

Fort Knox Van Voorhis Elementary School
New Construction, Demolition - 183,500 SF
Post-Bid
$25,000,000 to $100,000,000 est. value
Fort Knox, KY

Cline Elementary School Elevator
Results
Alexandria, Cold Spring, KY 41076

Both Pre-Construction Phase Services and Construction Phase Services
Addition
Results
Fort Mitchell, KY 41017

Johnson Elementary School
Construction
Less than $19,335,000 est. value
Fort Thomas, KY

New 800-Student Elementary School
New Construction - 88,967 SF
Construction
Mount Washington, KY 40047

Student Services Building Renovation/Addition
Renovation
Bidding
Bowling Green, KY 42103

Garrison Elementary School Replacement
New Construction, Renovation - 47,000 SF
Post-Bid
Garrison, KY 41141

New Elementary School
New Construction - 49,893 SF
Results
$8,400,000 to $8,500,000 est. value
Jackson, KY 41339

Re-Roof
Post-Bid
Less than $4,617,000 est. value
Morganfield, Sturgis, KY 42437

Cravens Elementary School
Renovation, Addition - 17,329 SF
Results
Less than $11,000,000 est. value
Owensboro, KY 42301

Outside Open Pavilions/Classrooms
New Construction
Post-Bid
Winchester, KY

Reported 03/04/2022 12:00 AM
Project Title

Flaherty Elementary School Renovation

Physical Address View project details and contacts
City, State (County) Ekron, KY 40117   (Meade County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $7,400,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of demolition of the existing front entry. Complete reworking of the existing HVAC system, replacement of all existing ceilings and lights to LED. All existing classrooms to receive new instructional wall equipment, and replacement of existing finishes. The existing Media Center and Administrative Suite are to undergo an extensive renovation including selective demolition.

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents