Similar Projects
Hudson Greenway Trail - State of Ohio
Infrastructure, Alteration
Conception
$750,000 est. value
Hudson, OH 44236

Hudson Greenway Trail - State of Ohio
Infrastructure, Alteration
Conception
$750,000 est. value
Hudson, OH 44236

Wyoga Lake Road Infrastructure & Apartment Building
New Construction - 2,000 SF
Design
Cuyahoga Falls, Stow, OH 44224

Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

RFQ D/B - CUVA 224822 Stabilize Cuyahoga Riverbank at High
Infrastructure
Bidding
$15,500,000 CJ est. value
Cleveland, OH 44113

SR 241/SR 764 - Four Lane Resurfacing
Infrastructure
Bidding
$3,275,000 est. value
Akron, OH 44306

Spot Safety - D04 PSIP Phase 2
Post-Bid
Akron, Canton, Youngstown, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Major Reconstruction - SR 8/IR 76/IR 77-00.63/09.74/08.42
Results
Akron, OH 44301

Crack Sealing - CS FY2021
Results

Akron Zoo - State of Ohio
Infrastructure
Conception
Akron, OH 44307

SR 134 - Bridge Preservation
Renovation, Infrastructure
Design
$530,000 est. value

Two Lane Resurfacing
Infrastructure
Bidding
$755,341 CJ est. value
Clinton, OH 44216

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Concrete Maintenance and Repair
Results
$118,000 est. value
Tallmadge, OH

Last Updated 07/22/2022 06:32 AM
Project Title

Goodyear Boulevard Bridge Replacement

Physical Address View project details and contacts
City, State (County) Akron, OH 44305   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,171,498 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

The following paragraphs replace CMS General Provisions 104.01 and 104.02, and add paragraphs 104.11 and 104.12. 104.01 Intent of Contract 104.02 Modifications of the Contract Documents 104.11 Change Order Procedure 104.12 Change Order Process SUM-GODYR-03350 This project includes the replacement of the Goodyear Blvd. Bridge over the W&LE Railroad. Questions Due Date: Jul 1st 2022, 12:00 PM EDT 280 calendar days after the start of construction (excluding winter shut down, if any) Estimated Commencement Date (Notice to Proceed) FOR ORDERING OF MATERIALS ONLY August 29, 2022 THE DBE GOAL IS 10% AS BID

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents