Project Title | Hot Mix Asphalt Pavement Removal, Cold Milling and Resurfacing Sidewalk and Ramps, Drainage and Pavement Markings on Haslett Road |
Physical Address | View project details and contacts |
City, State (County) | East Lansing, MI 48823 (Ingham County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected May 2022 |
Bids Due | View project details and contacts |
Estimated Value | $918,879 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of April 25, 2022, the project has been awarded. A timeline for constuction has not been confirmed. 0.40 mi of hot mix asphalt pavement removal, cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps, drainage, excavation, subbase, aggregate base, signal work and pavement markings on Haslett Road at Park Lake Road in the city of East Lansing, Ingham County. This is a Local Agency project. Control Sec Job No Federal No HSIP 33000 211847A 22A0337 Net classification required for this project is Comb/Jt. 968 Cb, Ea or Comb/Jt. 968 Cb, J or Comb/Jt. 968 Ea, J In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. MDOT - 2204 007 - Hot Mix Asphalt Pavement Removal, Cold Milling and Resurfacing Sidewalk and Ramps, Drainage and Pavement Markings on Haslett Road *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |