Similar Projects
Oak Meadows
New Construction, Infrastructure
Design
Huntsville, AL 35810

Cottonwood Classroom Addition
Addition
Bidding
$306,000 est. value
Cottonwood, AL 36320

Construction Manager at Risk - Terminal and Concourse Improvements Project
Renovation
Bidding
$2,000,000 est. value
Huntsville, AL 35824

Isbell Field Airport Apron Rehabilitation
New Construction
Post-Bid
Fort Payne, AL 35968

Engineering Services
Term Contract
Post-Bid
Reece City, AL

Modernization of Public Housing Site AL117-1A and AL117-1B Roofing
Results
$24,800 est. value
Chatom, AL

New St. Clair County Jail - Pell City - Bid Package -1 Civil
Results
$1,888,000 est. value
Ashville, Pell City, AL 35125

Oak Bowery Pines
New Construction
Construction
Opelika, AL 36801

Cannon Gate
New Construction - 1,300 SF
Construction
Opelika, AL 36801

Wyndham Village Subdivision - Phase One
New Construction
Pending Verification
Opelika, AL 36801

New Retail Store
New Construction
Pending Verification
Prattville, AL 36066

RSA Annex Building and Parking Deck Phase 5 Sitework Phase II-Office Building
Infrastructure
Bidding
$3,000,000 est. value
Montgomery, AL

Geneva County Jail Site Improvements
Post-Bid
Geneva, AL 36340

Site Improvements at Zion Chapel School Jack
Results
$49,390 est. value
Jack, AL 36346

Rural King - Building and Site Work
New Construction, Infrastructure - 86,439 SF
Construction
Albertville, AL

Last Updated 05/19/2022 03:10 PM
Project Title

Site Development and Construction of East Terminal Building at H.L. "Sonny" Callahan Airport

Physical Address View project details and contacts
City, State (County) Fairhope, AL 36532   (Baldwin County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Site Development
Contracting Method Competitive Bids.
Project Status Bidding, All Bids Received, Selection Expected third quarter 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Major items of work include the site development and construction of a Terminal Building at the H.L. "Sonny" Callahan Airport. Approximate quantities include: 1. Terminal Building - 1 LS 2. Asphalt - 165 TON 3. Type N Concrete Curb - 670 LF 4. Fence - 225 LF.

Details

Airline/Passenger Terminal, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents