Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Precast Concrete Pavement and HMA
Infrastructure
Bidding
$57,000,000 est. value
CA

Alameda Point Reuse Area Replacement Infrastructure
Infrastructure
Bidding
Alameda, CA 94501

Highway Safety Improvement Program HSIP 8 Oakland Hills
Infrastructure
Post-Bid
Oakland, CA

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

Excavation, HMA, Structural Concrete, Minor Concrete and Drainage
Infrastructure
Results
$23,400,000 est. value
CA

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

Modify Signal and Lighting System RHMA, HMA and Replace AC Surfacing
Infrastructure
Bidding
$5,600,000 est. value
Oakland, CA 94612

Airport Pavement
Infrastructure
Post-Bid
Hayward, CA 94541

Citywide Pavement Rehabilitation 2021
Infrastructure
Results
$13,486,600 est. value
Oakland, CA

Costco Road Improvement
Infrastructure
Bidding
$7,700,000 to $19,700,000 est. value
Pleasanton, CA 94588

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Citywide Pavement Rehabilitation
Infrastructure
Results
$13,486,600 est. value
Oakland, CA

Construction of the Johnson Drive Economic Development Zone Transportation Improvements
Infrastructure
Bidding
Pleasanton, CA 94588

Citywide Pavement Rehabilitation 2021
Infrastructure
Results
$5,072,530 est. value
Oakland, CA

Last Updated 01/10/2022 02:55 PM
Project Title

Street Rehabilitation FY 2022

Physical Address View project details and contacts
City, State (County) Berkeley, CA 94703   (Alameda County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work done under this component includes but is not limited to: traffic control, environmental protections, adjustment of valve boxes and utility boxes, frames, and covers, replacement of survey monuments, protection of underground utility services (e.g. gas, water, sewer, electrical, telecom), concrete curbs and gutters, sidewalk, curb ramps, driveways, cross drains at curb ramps, valley gutters, drainage, crack sealing, base failure repairs, ARAM cape seal, cold planning, removal and disposal of pavement surfaces and base materials, stabilization, hot-mix asphalt (HMA) and rubberized hot-mix asphalt (RHMA) paving, pavement markings, striping, markers, signage, and traffic loops as specified. The work done under this component includes but is not limited to developing and implementing a construction phasing plan and associated traffic controls; environmental protections; adjustment of valve boxes and maintenance hole covers; replacement of survey monument; protection of underground utility services (e.g. gas, water, sewer, electrical, telecom); concrete median refuge islands and raised concrete medians; cold planning, removal, and disposal of pavement surfaces and base materials; HMA paving, including speed table; slurry seal; pavement markings, striping, markers, and signage as specified.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents