Similar Projects
Wells 6 and 8 Water Treatment Plant Expansion
Addition, Infrastructure
Bidding
Anoka, MN

Water Treatment Services
New Construction
Post-Bid
New London, MN 56273

Water Treatment Chemicals
Term Contract
Post-Bid
Bloomington, MN 55431

Water Reclamation Plant Phase I Remodel & Effluent Upgrade
Results
Rochester, MN 55901

Water Treatment Facility Improvements
Results
Askov, MN 55704

Great Bend Water Treatment Plant
New Construction, Renovation
Construction
$5,500,000 est. value
Jeffers, MN 56101

Regional Drinking Water Project Contract D - Water Distribution System
Renovation
Post-Bid
Cloquet, MN 55720

MWWTP Rehab and Facility Improvements
Results
Saint Paul, MN 55101

Regional Drinking Water Project Contract B - Water Treatment Plant
New Construction
Post-Bid
Cloquet, MN 55720

2020 Water Treatment Facility Improvements
Results
Waconia, MN 55387

Bear Head Water Filtration System Replacement
Renovation
Post-Bid
MN

Water Treatment Plant No. 2 Rehabilitation
Results
Forest Lake, MN

Corrosion Inhibitor
Term Contract
Post-Bid
Minneapolis, MN

Water Treatment Plant Improvements
Renovation
Results
Waldorf, MN

Structure Demolition, Removal And Cleanup
Demolition - 2,053 SF
Post-Bid
Bemidji, Red Lake, MN 56671

Last Updated 12/17/2021 07:03 AM
Project Title

Water Treatment Facility Rehabilitation

Physical Address View project details and contacts
City, State (County) Arlington, MN 55307   (Sibley County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Rehabilitation of the existing four (4) cell concrete gravity filter to include: a. Replacement of existing filter media b. Replacement of existing filter underdrain nozzles c. Surface preparation and painting of interior concrete filter cells d. Replacement of existing valves 2. Furnish and install new air wash blower. 3. Furnish and install new duplex air compressor. 4. Furnish and install new chemical feed systems for chlorine gas, fluoride, polyphosphate, sodium permanganate and other miscellaneous chemical feed improvements. 5. Replacement of process valves, actuators, and flow meters. 6. Miscellaneous electrical, controls, and HVAC improvements. 7. Surface preparation and painting of existing process piping, tanks, and interior building components. 8. Replacement of two (2) submersible backwash waste pumps. 9. Miscellaneous demolition work associated with the rehabilitation work described above.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling, Demolition.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents