Similar Projects
Harlem Baden Phase 3
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Saint Louis, MO 63114

Jefferson Barracks Sanitary Sewer Connection Project - Department of Parks and Recreation
Infrastructure
Bidding
$300,000 est. value
Bella Villa, MO 63125

Denmark Road Utility Extension
Infrastructure
Bidding
$500,000 est. value
Union, MO 63084

Highway Department Maintenance Facility - Phase 2
Post-Bid
Carthage, MO

Clayton Meramec Elementary Private I/I Removal (South Meramec Avenue at Walinca Ter)
Post-Bid
$180,000 est. value
Clayton, MO 63105

Park Drive Sanitary Relief (Engelholm Avenue) Phase II
Results
$1,394,000 est. value
Greendale, Normandy, Pagedale, MO

Shrewsbury Sanitary Relief Sewer and I/I Reduction (Weil Ave and I-44
Results
$980,000 est. value
Saint Louis, MO

Sewer Line Repair at Various Locations Fiscal Year 2023 (On-Call Contract)
Term Contract
Bidding
Kansas City, MO

2021 Emergency Repairs and On-Call Sewer
Term Contract
Post-Bid
Joplin, MO

Wastewater Collection System Rehabilitation
Results
Jonesburg, MO

Highway 58 Drainage Improvements
Infrastructure
Bidding
$400,000 est. value
Belton, MO 64012

Remove and Replace Damaged Sewer Line and Exterior Works
Infrastructure
Post-Bid
Kansas City, MO 64117

City Wide Sewer Main Rehabilitation Fiscal Year 2022
Results
Kansas City, MO

2 Year Maintenance / Emergency Services Contract for the Water Distribution and Wastewater Collection System
Infrastructure
Bidding
Ferrelview, MO

North Union Street Sanitary Sewer and Lift Station and North Industrial Park Sanitary Sewer Extension
Infrastructure
Post-Bid
Jackson, MO 63755

Last Updated 07/12/2022 02:14 AM
Project Title

Mazuma Force Main Replacement

Physical Address View project details and contacts
City, State (County) Raymore, MO   (Cass County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $99,049 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Raymore, Missouri. Completed plans call for site work for a water / sewer project.Miscellaneous, RFP/RFQ/RFLOI, Sewer Force Main, Lift Stations/Lift Station Equipment Installation of 350 feet of 24" ductile iron force with two 90 degree bends. Removal and disposal of 350 feet of existing 24" DIP force main, bends and fittings. Connect to existing force main and existing manhole where the force main turns to gravity sewer. Force main can be shut down and drained for a maximum of two days.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents