Similar Projects
Last Updated | 08/29/2022 09:23 AM |
Project Title | SR 750 - Two Lane Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | Powell, OH 43065 (Delaware County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected May 2022 |
Bids Due | View project details and contacts |
Estimated Value | $926,812 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Urban/General System Paving:DEL-750-2.17-4.22 (~Sawmill Road to just West of SR-315)AC Overlay with Repairs:DEL-750-2.17-2.26 & 3.87-4.22AC Overlay without Repairs:DEL-750-2.26-3.87 For Improving Various Sections in the City of Powell, Within Liberty Township, of Delaware County, Ohio, in Accordance With Plans and Specifications by Resurfacing 1.87 Miles of State Route 750 From Slm 2.17 (Sawmill Rd) to Slm 4.22 (Pavement Break Before Downhill Slope to Sr 315/sr 750 Intersection) With 1.50" Lift of 12.5mm Asphalt Concrete, Including All Related Items of Work. Project Includes Replacement of a 18" Diameter Culvert and Castings on Sr 750 at Slm 4.18, Replacment or Modification of Some Curb and Gutter and Curb Ramps Within the City of Powell. Del-750-4.18 Culvert: Allowed a Full Roadway Closure to Replace the Culvert. Closure Will Be Required to Be During a Consecutive 56 Hour Period From a Friday Night at 9:00pm-a Monday Morning at 5:00am. OHDOT - SR 750 - Two Lane Resurfacing |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |