Similar Projects
Bridge Repair
Renovation
Conception
$4,400,000 est. value
Schroeder, MN 55613

Mill and Overlay - TH 61
Infrastructure
Conception
$2,800,000 CJ est. value
Schroeder, MN 55613

Bridge 16J15 Over Junco Creek
Infrastructure
Bidding
$600,000 CJ est. value
West Cook, MN 55604

Bridge 16J15 Over Junco Creek
Infrastructure
Bidding
$600,000 CJ est. value
West Cook, MN 55604

B-364(5) Bridge Repair Enamels and Sealers
Renovation, Term Contract, Infrastructure
Post-Bid
$35,000 to $40,000 est. value

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

CSAH 12 Bog Crossing Repairs
Results
$99,717 est. value
MN

CR 46 Cross River Bridge
Results
MN

5th Avenue West (C.S.A.H. 15) Reconstruction
Infrastructure
Bidding
$800,000 CJ est. value
Grand Marais, MN 55604

Grand Marais Overlook Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Grand Marais, MN 55604

Carlson Creek Bridge
New Construction, Infrastructure
Results
Hovland, MN 55606

Grading and Base for Paved Bituminous Multi-Use Trail and Concrete Crosswalk Landings
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Grand Marais, MN 55604

Bridge Beam Straightening - By County
Renovation, Term Contract, Infrastructure
Results

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

CR 45 Reconstruct
Infrastructure
Results
MN

Last Updated 02/22/2023 05:13 AM
Project Title

Bridge Repair and Rehab - TH 61

Physical Address View project details and contacts
City, State (County) Schroeder, MN 55613   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pigeon River--bridge repair & rehab. As of February 22, 2023, the project is in Conceptual status. Anticipated letting date is January 26, 2024. MNDOT - Bridge Repair and Rehab - TH 61 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents