Similar Projects
Thomas Metcalf School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$74,459,972 CJ est. value
Normal, IL 61790

University High School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$82,297,800 CJ est. value
Normal, IL 61761

Outbound Charging Station Substation Foundation / Rivian Automotive
New Construction, Infrastructure
Design
$706,965 CJ est. value
Normal, IL 61761

QuikTrip / Bloomington
New Construction, Infrastructure - 8,000 SF
Design
$4,000,000 CJ est. value
Bloomington, IL 61705

FY 2024 General Resurfacing - Phase 2
Infrastructure
Bidding
$225,000 CJ est. value
Bloomington, IL 61701

FY 2024 General Resurfacing - Phase 2
Infrastructure
Bidding
$225,000 CJ est. value
Bloomington, IL 61701

110,000 Gallon Standpipe Rehabilitation
Infrastructure
Post-Bid
$500,000 CJ est. value
Arrowsmith, IL 61722

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

2022 Non-MFT Construction Sections
Infrastructure
Results
IL

2022 Miscellaneous Sidewalk Improvements
Infrastructure
Results
Normal, IL

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Constitution Trail Extension - Lafayette Street to Hamilton Road - 40100100-70051 - City of Bloomington
Infrastructure
Conception
$320,000 CJ est. value
Bloomington, IL 61704

Complete Structure Replacement Over Intermittent
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Chenoa, IL 61726

Last Updated 01/05/2024 06:01 PM
Project Title

FY24 General Sidewalk, Curb and Gutter Replacement Program - Phase 2

Physical Address View project details and contacts
City, State (County) Bloomington, IL 61701   (McLean County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Bloomington, incorporated in 1856, is a home rule unit of government under the 1970 Illinois Constitution. The City of Bloomington is located in the heart of Central Illinois, approximately 125 miles southwest of Chicago, 155 miles northeast of St. Louis and 64 miles northeast of Springfield, the State Capital. The City of Bloomington is the County Seat of McLean County, the largest county in Illinois (approximately 762,240 acres). The results of the 2010 Census shows the City now has a population of 76,610 citizens. The economic strength of the City of Bloomington metropolitan area is well diversified with no single dominating industry. Questions Due to City:December 29, 2023, 4:00pm Response from City:January 5, 2024, 3:00pm The City of Bloomington reserves the right to reject any and all bids and to waive technicalities. This project is being supported, in whole or in part, by federal award number SLFRP0597 awarded to City of Bloomington by the U.S. Department of the Treasury. Bid must be accompanied by a Bid guaranty which shall not be less than ten percent (10%) of the amount of the Bid. Bid guaranty may be a cashier's check, money order, certified bank check, or a surety bond. All guaranties, except surety bonds, will be deposited and reimbursement checks and surety bonds will be issued to unsuccessful bidders following the bid award. The successful bidder will be required to provide Performance and Payment Bonds in the amount equal to 100% of the contract price, within ten (10) business days after the bid award. The City of Bloomington requires all Bidders/Consultants doing business with the City not to discriminate on the basis of race, age, color, religion, gender, ancestry, national origin, marital status, mental or physical disability unrelated to ability, familial status or sexual orientation. A pre-bid meeting/site visit will not be held for this solicitation. It is highly suggested that interested parties view the project site and/or understand the requirements of the solicitation before submitting a response. FY24 General Sidewalk, Curb and Gutter Replacement Program - Phase 2 This project consists primarily of the following major work items: Approximately 26,661 SQ FT Sidewalk Removal Approximately 5,292 SQ FT P.C.C. Sidewalk 6" Approximately 18,388 SQ FT P.C.C. Sidewalk 4" Approximately 2,390 SQ FT P.C.C. ADA Ramps Approximately 17 EACH inlet reconstructions and 15 EACH inlet adjustments. Approximately 2,225 FT of curb and gutter.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents