Similar Projects
Shiocton - Bear Creek Const / Surface
Infrastructure
Conception
$6,000,000 CJ est. value
Shiocton, WI 54170

Stephensville - Shiocton Const / Resurf
Infrastructure
Design
$3,000,000 CJ est. value
Hortonville, WI 54944

T. Grand Chute, College Ave Des-Bld / BRRPL
Demolition, New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Appleton, WI 54914

Appleton Lower Dam Gates 1-5 Replacement
Infrastructure
Bidding
$5,000,000 CJ est. value
Appleton, WI 54911

2023 Street Reconstruction State Street and Janssen Street
Infrastructure
Bidding
$2,200,000 CJ est. value
Combined Locks, WI 54113

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

2022 Sanitary and Water Main Replacement - North Avenue
Infrastructure
Post-Bid
Little Chute, WI 54140

9th Street Area Utility Relay
Results
Kaukauna, WI

Inside the Park Place Utility Installation and Grading
Infrastructure
Results
Kaukauna, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Appleton Public Library Construction/Renovation BU 32C Landscaping / Irrigation
New Construction, Infrastructure - 120,000 SF
Pending Verification
$4,531,723 CJ est. value
Appleton, WI 54911

Kwik Trip #887 Building Addition / Grand Chute
Addition, Demolition, Infrastructure - 1,463 SF
Pending Verification
$400,000 CJ est. value
Appleton, WI 54913

Bernatello's Waste Water Treatment Plant
New Construction, Infrastructure - 3,375 SF
Design
$2,800,000 CJ est. value
Kaukauna, WI 54130

2023 Concrete Street Paving Project
Infrastructure
Bidding
$1,000,000 CJ est. value
Kaukauna, WI 54130

Last Updated 03/13/2023 01:06 AM
Project Title

2022 Private Lead Water Service Replacements

Physical Address View project details and contacts
City, State (County) Kimberly, WI 54136   (Outagamie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $822,828 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Sewer and Water Construction Description: The work shall consist of 200 private water service replacements to homes in the Village of Kimberly. The project is being funded through a Wisconsin Department of Natural Resources (DNR) grant. The project shall require compliance with Davis-Bacon Wage Rates and American Iron and Steel. We encourage DBE's, including MBE's and WBE's, to submit bid proposals for this work directly as Prime Contractors or to Prime Contractors. The awarded contractor shall be required to provide written documentation that good faith efforts were made in soliciting DBE's for use as subcontractors during the bidding process. DBE solicitation guidance is available on the Wisconsin DNR's website. Both pipe bursting and excavation shall be acceptable for lateral replacement.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents