Similar Projects
Replace/Repair Portland St. Culvert - FY22-PWD-46 - City of Rochester
Infrastructure
Conception
$750,000 CJ est. value
Rochester, NH 03868

Union Street Parking Lot Reconstruction - FY23-PWD-74 - City of Rochester
Infrastructure
Conception
$1,100,000 CJ est. value
Rochester, NH 03867

UNH Field House West Lot Parking Lot Site Improvements
Infrastructure
Design
$200,000 CJ est. value
Durham, NH 03824

High Street (Route 9) Corridor Signal Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Somersworth, NH 03878

Varney Brook Pump Station Upgrade
Results
Dover, NH 03820

River Street Pump Station Upgrade
Renovation
Results
Rochester, NH 03867

Fownes Mill Condominiums
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Rochester, NH 03867

2A Tactical
New Construction, Infrastructure - 11,080 SF
Pending Verification
$1,500,000 CJ est. value
Barrington, NH 03825

Apple Ridge Rochester Hill Multi-Residential Development Phase 3
New Construction, Infrastructure
Pending Verification
$8,000,000 CJ est. value
Rochester, NH 03867

Route 11 Pump Station Upgrade
Results
Rochester, NH

Allonsy - Park Recovery Center of Dover
New Construction, Infrastructure - 25,500 SF
Pending Verification
$15,000,000 CJ est. value
Dover, NH 03820

Amanda Howard Park Playground Site Preparation
Infrastructure
Results
Dover, NH 03820

Shammy's Car Wash
New Construction, Infrastructure - 3,000 SF
Pending Verification
$1,000,000 CJ est. value
Somersworth, NH 03878

Contractor - Tara Estates Sewer Pump Station Upgrade
Renovation
Results
$300,000 est. value
Rochester, NH

Gator Rock Road And Seamore Drive Distribution Center
New Construction, Infrastructure - 160,000 SF
Pending Verification
$17,000,000 CJ est. value
Somersworth, NH 03878

Last Updated 08/17/2022 06:02 PM
Project Title

Cocheco Well Treatment Upgrades - FY22-WAT-70 - City of Rochester

Physical Address View project details and contacts
City, State (County) Rochester, NH 03867   (Strafford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $5,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Cocheco Well (Well 1) is currently pumped to a treatment facility that includes aeration, pH and alkalinity adjustment, and chemical addition for chlorine, fluoride, sodium bicarbonate, and blended polyphosphate. This funding request is for the addition of iron and manganese removal treatment, including increasing the size of the facility to accommodate these new treatment systems. This project is included in the city's 2023-2028 Capital Improvement Plan (CIP) and funding is allotted for FY 2023. As of August 17, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents