Similar Projects
Last Updated | 04/12/2022 12:12 PM |
Project Title | Upgrade Vehicle Assembly Building 325 Ton Crane At Kennedy Space Center, Fl |
Physical Address | View project details and contacts |
City, State (County) | Orlando, FL (Orange County) |
Category(s) | Single Trades |
Sub-Category(s) | Equipment |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope consists of upgrading controls and interfaces, power feed and distribution systems, and actuation and braking systems on a 325-ton overhead bridge crane located in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center (KSC) in Florida. The work includes replacing the hoist and travel brakes, the crane power feed rail, the E-Stop system, all operator interface devices, hook rotation system, hoist weighing system, motor controls, PLC Systems, Tachometers and Encoders, UPS, and power distribution system. The scope will include design, installation, testing, and other incidental related work. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |