Similar Projects
Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Retention Pond Maintenance Services
Infrastructure
Bidding
GA

Arnold Mill Road at Laurel Way Storm Drainage Repair
Infrastructure
Bidding
Canton, GA

CDBG Engineering Services
Post-Bid
Alma, GA

Street and Drainage Improvements to Oak Lane
Post-Bid
Less than $250,000 est. value
Argyle, GA 31623

Holly Court Drainage Repairs
Results
Acworth, GA 30101

First Street Resurfacing, Street, Water Extension
Results
Richmond Hill, GA 31324

Flint River Outfall Replacement - Phase 4
Infrastructure
Bidding
Riverdale, GA 30274

Site Pavement and Erosion Repair
Post-Bid
Savannah, GA

Forest Lakes Drainage Canal Improvements
Results
Less than $388,340 est. value
Pooler, GA 31322

Woofstock Park Drainage Improvements
Infrastructure
Bidding
Woodstock, GA 30188

Pipe Makers Canal Improvements - Division 1
Post-Bid
Pooler, GA

Driveway Culvert Replacement and Ditch Re-Grading - Richmond Heights Subdivision
Results
Richmond Hill, GA

2019-2021 LMIG Street and Drainage Improvements
Post-Bid
$790,000 est. value
Homerville, GA

Last Updated 01/21/2022 08:19 AM
Project Title

Shadburn Ferry Road Drainage Improvements

Physical Address View project details and contacts
City, State (County) Buford, GA   (Gwinnett County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The Project includes the following Work: Installation of a new reinforced concrete pipe (RCP) storm drainage system along Shadburn Ferry Road in preparation for a sidewalk improvement project, including site work, curb and gutter, roadway widening, concrete driveway repair, erosion/sediment control measures, labor and materials necessary to install the authorized work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents