Similar Projects
Hillsdale Boe Boiler Replacement at Meadowbrook School
Alteration
Bidding
$175,000 est. value
Hillsdale, NJ 07642

Boiler Replacement at Cherry Hill Elementary School and Roosevelt Elementary School
Alteration
Bidding
$1,000,000 est. value
River Edge, NJ 07661

HVAC and Mechanical Products
Term Contract
Post-Bid

On Call Services and Repair: Plumbing, Electric, HVAC
Post-Bid
Westwood, NJ

HVAC Renovations at the Franklin Elementary School and Helen I. Smith Elementary School
Results
$500,000 est. value
Saddle Brook, NJ 07663

High School Woodshop Dust Collector Replacement
Results
Less than $135,000 est. value
Bergenfield, NJ 07621

Heating, Ventilating and Air Conditioning Service and Repair Work
Alteration
Bidding
Demarest, NJ

Norwood HVAC Upgrades Phase III
Post-Bid
$630,000 est. value
Norwood, NJ 07648

Heating and Ventilation Equipment and Services, Boiler Repair and Maintenance
Term Contract
Results
Tenafly, NJ 07670

Boiler Replacement at High Mountain Road School School
Alteration
Bidding
$500,000 est. value
Franklin Lakes, NJ 07417

Hydrogen Peroxide Air Filtration & Disinfection Products
Post-Bid

Automation and H.V.A.C. Controls Maintenance and Services
Term Contract
Results
Tenafly, NJ 07670

Boiler Maintenance and Repair Work
Alteration
Bidding
Demarest, NJ

On-Call Time And Materials Services - Boiler Service
Post-Bid
Oakland, NJ

Borough Municipal Building Heating System Update
Results
Bergenfield, NJ 07621

Last Updated 05/18/2022 05:18 AM
Project Title

Boiler Room Upgrades at the Ramsey High School

Physical Address View project details and contacts
City, State (County) Ramsey, NJ 07446   (Bergen County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Contract A: Removal of steam boilers and replacement with new hot water system. 2. Contract B: Removal of radiators and existing unit ventilators (UV's) and replacement with new hot water system unit ventilators. Contract A: $1.5 Million Contact B: $2 Million.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents