Similar Projects
1120 & 1130 N State
Demolition, New Construction, Infrastructure - 10,000 SF
Design
$50,000,000 CJ est. value
Chicago, IL 60610

1120 & 1130 N State
Demolition, New Construction, Infrastructure - 10,000 SF
Design
$50,000,000 CJ est. value
Chicago, IL 60610

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Asphalt Parking Lot Removal & Replacement
Demolition, Alteration
Post-Bid
$300,000 est. value
Lansing, Tinley Park, IL 60438

Burley ES - LBP Mitigation and ACM Patch & Repair in the Ventilation System
Term Contract, Infrastructure
Results
$29,725 CJ est. value
Chicago, IL 60657

Street Resurfacing
Results
Park Ridge, IL

The Fields Development
Addition, New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Chicago, IL 60647

Lake Street Office
New Construction, Infrastructure - 67,600 SF
Construction
$16,600,000 CJ est. value
Chicago, IL 60607

Dialysis Care Center Western
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Chicago, IL 60620

Halsted Street Mixed-Use Development
New Construction, Infrastructure - 4,000 SF
Pending Verification
$2,000,000 CJ est. value
Chicago, IL 60614

Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

DMDF Vertical Expansion Project Front Ends
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Chicago, IL 60604

Resurfacing and Improvements on Summit Drive From Wise Road to Schaumburg Road in Schaumburg
Infrastructure
Results
Schaumburg, IL 60168

St. Alexius Medical Center Addition
Addition, Infrastructure, Renovation - 29,000 SF
Construction
$14,000,000 CJ est. value
Hoffman Estates, IL 60169

North Rush Street Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$1,900,000 CJ est. value
Chicago, IL 60611

Last Updated 02/14/2024 03:52 PM
Project Title

Green Bay Road Corridor Improvements - McCormick Boulevard to Isabella Street - City of Evanston

Physical Address View project details and contacts
City, State (County) Evanston, IL 60201   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $1,374,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 14, 2024, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is expected to start prior to summer 2025. *The closed solicitation has been included below for reference: The City of Evanston Bureau of Capital Planning and Engineering of Public Works Agency is seeking statements of qualifications from experienced engineering firms for the Green Bay Road Corridor Improvements from McCormick Blvd to Isabella Street - Phase I Engineering Study per the IDOT/ Federal requirements. The limits of the project are from McCormick Boulevard to Isabella Street. The selected consultant may also be awarded the Phase II Design Engineering and Phase III Construction Engineering after the successful completion of Phase I Engineering. Bid Bond: N/A The City (the City of Evanston) in accordance with the laws of the State of Illinois, hereby notifies all firms that it will affirmatively ensure that the contract(s) entered into pursuant to this notice will be awarded to the successful firm without discrimination on the grounds of race, color, religion, sex, age, sexual orientation marital status, disability, familial status or national origin. The State of Illinois requires under Public Works contracts that the general rate of wages in this locality be paid for each craft or type of worker hereunder. This requirement is in accordance with The Prevailing Wage Act (820 ILCS 130) as amended. The City of Evanston reserves the right to reject any or all submittals or to accept the submittal(s) deemed most advantageous to the City. Project Awarded to Kimley-Horn and Associates, Inc The Evanston City Council also reserves the right to award the contract to an Evanston firm if that firm's bid is within 5% of the low bid. Each Proposer shall be required to submit with his/her proposal a Disclosure of Ownership Interest Statement Form in accordance with Section 1-18-1 et seq. of the City Code. Failure to submit such information may result in the disqualification of such proposal. The method of contractor selection has not been determined at this time *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents