Similar Projects
WWFT Storage Tank Cleaning and Painting Projects
Post-Bid
New Port Richey, FL 34652

Storage Tank Repairs at Southeast Booster Station
Post-Bid
Less than $500,000 est. value
Panama City, FL 32403

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Ground Storage Water Tank Repair, Northeast Florida State Hospital
Results
Macclenny, FL

Glass Fused-to-Steel Tank Rehabilitation
Term Contract
Results
Less than $377,516 est. value
Middleburg, FL 32068

Water Tank Replacement - Contract I
Results
Less than $500,000 est. value
Cottondale, FL 32431

SCWRF Reclaimed Water Storage Tank Improvements
Results
Less than $1,700,000 est. value
Naples, FL 34113

Water Storage Tank Replacement
Results
Less than $1,400,000 est. value
Cooper City, FL 33329

Underground Tank Spill Bucket Replacement
Results
Tavares, FL 32778

Tank Cleaning Services, Wastewater Treatment Plants, Term Contract
Term Contract
Results
West Palm Beach, FL 33437

Reclaimed Water Ground Storage Tank Cleaning and Inspection
Term Contract
Results
Less than $45,000 est. value
Naples, FL 34112

PEP Tank Replacement
Results
Ormond Beach, FL 32175

35,000 Gallon Elevated Storage Tank Rehabilitation
Results
Lake Como, FL 32157

Last Updated 06/05/2020 09:25 AM
Project Title

Low Bid Technically Acceptable Design Build Services for Sawgrass WTP 0.5 MG Ground Storage Tank

Physical Address View project details and contacts
City, State (County) Ponte Vedra Beach, Saint Johns, FL 32082   (Saint Johns County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $908,212
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, material, and services to demolish the existing structure, design, construct, and test one 0.5 million gallon circular wire wrapped pre-stressed concrete potable water ground storage tank with concrete dome roof and tray aerator. Also included in the Contract is site work, excavation, backfill, foundation design and site preparation, pipelines through the foundation and/or tank wall, valves, and fittings as described herein and shown in Appendix A. The contractor shall be responsible for geotechnical exploration of the site to confirm existing soils are suitable.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents