Similar Projects
Install Push Button Actuated Flashing Pedestrian Beacons, Sidewalk Improvements , Signage, and Pavement Markings at Midblock Crossing on Wolf Road
Infrastructure
Bidding
$500,000 CJ est. value
Indian Head Park, IL 60525

U20118 Undergraduate Library Redevelopment
Renovation
Bidding
$32,000,000 CJ est. value
Urbana, IL 61801

Traffic Operations Center and Dispatch Center Renovation - Electrical / IT
Renovation
Sub-Bidding
$8,071,037 CJ est. value
Downers Grove, IL 60515

Westview Concrete Porch
Alteration
Post-Bid
Quincy, IL 62301

Concrete Materials for 2022 Public Works Maintenance
Alteration
Post-Bid
Centralia, IL

Pin & Link Assembly Expansion Joint Retrofits 4
Alteration
Results
Chicago, IL

Concrete - Various Sites District Wide Plus Alternative Work
Alteration
Results
Algonquin, Carpentersville, IL 60102

Construction of Arenzville Rural Water Cooperative Phase III
Infrastructure
Construction
$1,519,702 CJ est. value
Arenzville, IL 62611

Construction of Arenzville Rural Water Cooperative Phase III
Infrastructure
Construction
$1,519,702 CJ est. value
Arenzville, IL 62611

2023 Rebuild Illinois Resurfacing Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Villa Park, IL 60181

Concrete Materials
Alteration
Post-Bid
Saint Charles, IL

Sidewalk/Driveway/Apron and Curb and Gutter Concrete Replacement
Infrastructure, Alteration
Results
Darien, IL

Chiarts High School - Playground Pip Resurface
Infrastructure
Bidding
$75,000 CJ est. value
Chicago, IL 60622

Concrete Lifting Services
Alteration
Post-Bid
Saint Charles, IL

Berg Instructional Center Concrete Repairs
Alteration
Results
Glen Ellyn, IL 60137

Last Updated 07/11/2023 12:45 PM
Project Title

Reconstruct Souwanas Trail

Physical Address View project details and contacts
City, State (County) Algonquin, IL 60102   (McHenry County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $8,448,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 11, 2023, the project has been awarded. A timeline for construction has not been confirmed. Reconstruct Souwanas Trail from Oceola Street to Sanbloom Road, and the reconstruction of Schuett Street from Scott Street to Hubbard Street in Algonquin. Region 1 District 1 Federal Project # 9132(817) County(s) McHenry Key Route(s) FAU 4004 FAU 4003 Marked Route(s) SOUWANAS TRL & SCHUETT ST Section(s) 17-00092-00-PV (ALGONQUIN) State Job #(s) C-91-098-22 PPS #(s) 1-22487-0000 1-22487-0010 Completion Date: 190 Working Days Questions not accepted as of February 28, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, February 17, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 081 - Reconstruct Souwanas Trail Liquidated Damages :- Should the Contractor fail to complete the plant care and/or supplemental watering work within the scheduled time frame as specified in the Special Provision forPlanting Woody Plants, Planting Perennial Plants , Perennial Plant Care, and Supplemental Watering, or within 36 hours notification from the Engineer, or within such extended times as may have been allowed by the Department, the Contractor shall be liable to the Department in the amount of: $50.00 per tree/per day *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents