Similar Projects
Airport Helipads - City of Concord
New Construction, Infrastructure
Conception
$410,000 est. value
Concord, NC 28027

Academy Recreation Center/Gibson Village Complex Development - Phase I - City of Concord
New Construction, Renovation, Infrastructure
Conception
$1,190,000 est. value
Concord, NC 28025

Davidson Highway Industrial
New Construction, Infrastructure - 139,800 SF
Design
$75,000,000 CJ est. value
Concord, NC 28027

Concord ABC Operations Center Addition
Addition, Demolition, Infrastructure
Bidding
$1,000,000 CJ est. value
Concord, NC 28027

R. Brown McAllister STEM Elementary **Balance of Work Package**
New Construction, Infrastructure - 116,000 SF
Sub-Bidding
$37,000,000 CJ est. value
Concord, NC 28025

Lower Rocky River Pump Station Expansion
Post-Bid
Concord, NC 28025

Substation T
Infrastructure
Post-Bid
Concord, NC

Kannapolis Crossing Contract 4 - Booster Pump Station
Results
Kannapolis, NC

David Phillips Community Center Terraced Garden
Infrastructure
Results
$728,839 CJ est. value
Concord, NC 28025

R. Brown McAllister Elementary School - Early Release Packages
New Construction, Infrastructure - 116,000 SF
Construction
$37,000,000 CJ est. value
Concord, NC 28025

Davidson Highway Ranch Homes
New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Concord, NC 28027

Highway 73 Industrial
New Construction, Infrastructure - 419,000 SF
Pending Verification
$225,000,000 CJ est. value
Concord, NC 28027

South Development Apron Expansion Phase 2 - City of Concord
Renovation, Infrastructure
Conception
Less than $10,904,589 est. value
Concord, NC 28027

FY23 ADA Improvements
Infrastructure
Post-Bid
$267,991 CJ est. value
Harrisburg, NC 28075

Virtual Academy Parking Addition
Infrastructure
Results
$56,723 CJ est. value
Concord, NC 28027

Last Updated 09/06/2022 04:32 PM
Project Title

Province Green Pump Station Elimination

Physical Address View project details and contacts
City, State (County) Concord, NC 28025   (Cabarrus County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,597,074 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 6, 2022. The Project has been awarded to Barton Contracting Corporation in the amount of $1,597,074.33.** This project consists of the installation of 2,964+/- feet of 12-inch diameter PVC and DI sewer line to eliminate the existing pump station located within the Province Green subdivision. Eight (8) new manholes will be installed as part of this project. The proposed sewer line will discharge into the Water and Sewer Authority of Cabarrus County (WSACC) Coddle Creek sewer outfall and will cross under the stream. Open cutting the stream will be necessary to install the required casing. This excavation will be completed in accordance with Water Quality General Certification No. 4276 as attached in Appendix B. Technical questions: Contact Noah Shaver, (shavertn@concordnc.gov)

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents