Similar Projects
Chessie Trail Phase II - City of La Porte
Infrastructure
Conception
$500,000 est. value
La Porte, IN

HMA Overlay Minor Structural - SR 212
Infrastructure
Design
$675,993 est. value
Michigan City, IN 46360

Bike and Pedestrian Facilities
Infrastructure
Bidding
$1,817,850 CJ est. value
La Porte, IN 46350

Bike and Pedestrian Facilities
Infrastructure
Bidding
$1,817,850 CJ est. value
La Porte, IN 46350

2020 Michigan City - CCMG Paving
Post-Bid
Less than $200,000 est. value
Michigan City, IN

Westville Schools New Chiller and Site Improvements
Post-Bid
Westville, IN 46391

Laporte County Highway Community Crossings Pavement Grant
Results
Less than $2,000,000 est. value
La Porte, IN 46350

Abandoned Coal Mine Restoration
Results
$150,000 est. value

RFP Engineering - Construction Inspection Services
Infrastructure
Pending Verification
$5,400,000 CJ est. value
La Porte, IN 46350

RFP Engineering - Construction Inspection Services
Infrastructure
Pending Verification
$5,400,000 CJ est. value
La Porte, IN 46350

Intersection Improvement With Added Turn Lanes
Infrastructure
Bidding
$1,483,882 CJ est. value
La Porte, IN 46350

Parking Lot Newspaper Ad - Pave Parking Lot
Post-Bid
La Porte, Valparaiso, IN 46383

Kingsford Heights Pavement Improvement
Results
Less than $300,000 est. value
Kingsford Heights, IN

RFP D/B - Pole Barn Building
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Michigan City, IN 46360

18th Street Greenway
Post-Bid
La Porte, IN 46350

Last Updated 08/01/2022 02:35 PM
Project Title

RFP Engineering - Construction Inspection Services

Physical Address View project details and contacts
City, State (County) Union Mills, IN 46382   (La Porte County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $24,478,760 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Inspection Services Contract B-39491 for 2 bridge projects on SR 249 in Porter County Owner Office Laporte District / Capital Program Mgmt Contract Type Project Specific Compensation Method Negotiated Labor Rate Two Step Scoring No Allowable Profit Rate 8.5% Plus Overhead Factor Is Federal Funding Involved Yes # of Firms to Select 1 The selected firm shall provide construction inspection services for construction contract B-39491 on SR 249 in Porter County in the Laporte District. The anticipated Letting Date is December 8, 2021. The projected time period of need for construction inspection through substantial completion is estimated from March 2022 through August 2023. INDOT anticipates needing a total of 1 Project Engineer/Supervisor for 4,140 regular hours and 570 overtime hours; and 1 Highway Technician/Inspector for 4,880 regular hours and 1,260 overtime hours. The selected firm shall provide personnel local to the projects such that neither lodging nor subsistence expenses will be incurred. INDOT may require personnel to work in any season, work up to 12 hours per day, and/or work at night. The selected firm's personnel shall work under the INDOT Area Engineer. The work type and the contractor's schedule will ultimately determine the length of time each PE/S and Inspector will work on this contract. The consultant shall furnish all construction field testing equipment necessary to sample and test materials in accordance with INDOT procedures. The consultant shall furnish all necessary safety equipment needed for inspection and sampling and testing of materials. Letters of Interest (LOIs) must specify the names of the project supervisors and inspectors who will be supplying services under this contract. Also, a map showing the residential locations of these personnel must be provided in the LOI. Personnel identified in the LOI who are not full-time employees at the time of the LOI submittal shall be identified with explanation of employment status. The LOI must identify the specific subject area certifications that personnel have obtained through the INDOT Certified Technician Program (CTP), unless the personnel is exempt. INDOT will not reimburse for any time or expense incurred in obtaining certifications. INDOT does not allow consultants that performed design for the contract to be the prime consultant for inspection and does not allow these consultants to provide the PE/S services. See the INDOT Conflict of Interest Policy for more information. The selected consultant's fee proposal shall be due 15 calendar days after the selection for this RFP item. A field overhead rate will be used for this contract. Consultants without audited field overhead rates may propose a field rate at the time of contract negotiation. This contract will utilize the INDOT eInvoice application. Prequalification Required: Yes 1600500 - 1600500 - SR 249, Replace Superstructure, US 12, 2 RR, 2 Roads, 2.0 mi N of I-94, in Porter Co. RP 002+024 to RP 002+024; 1802046 - SR 249, New Bridge, Other, US 12, 2 RR, 2 Roads, 2.0mi N of I-94, in Porter Co. RP 002+024 to RP 002+024. - $24,478,760.00 INDOT - RFP Engineering - Construction Inspection Services As of August 1, 2022, an issuance of short-list of firms has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents