Similar Projects
LA 465: LA 8 - LA 28
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
LA

La 489: Fort Polk to La 121
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
LA

Dr 4263 Pw 910 Paved Roads - Task Order No. 4
Infrastructure
Results
$4,500,000 est. value

LA 392 Bridges Near Hornbeck
New Construction, Infrastructure
Results
$2,500,000 to $5,000,000 est. value
LA

Rehabilitation of several existing roads in Washington Parish
Infrastructure
Post-Bid

2022 District 12, 13, 14 Road Improvements
Infrastructure
Results
$1,366,416 est. value

2022 District 7, 9 Road Improvements
Infrastructure
Results
$1,797,697 est. value

Asphalt Grinding
Term Contract
Post-Bid
Leesville, LA

2 Asphalt Overlay (Level 1 Non-Polymer)
Infrastructure
Post-Bid
Leesville, LA

Chip Seal
Infrastructure
Post-Bid
Leesville, LA

Asphalt Road Leveling (Level 1 Non-Polymer)
Infrastructure
Post-Bid
Leesville, LA

1.5 Asphalt Overlay
Infrastructure
Post-Bid
Leesville, LA

Asphalt
Infrastructure
Post-Bid
$520,000 est. value
Leesville, LA

2022 Street Rehabilitation
Infrastructure
Post-Bid
$900,000 est. value
Leesville, LA

Dusenbury and Engineer Lake Embankment Dam Road Repairs
Infrastructure
Design
$100,000 est. value
Fort Polk, LA

Last Updated 07/18/2022 04:09 AM
Project Title

US 171: Schweitzer Ave to La 28

Physical Address View project details and contacts
City, State (County) Leesville, LA 71446   (Vernon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Drainage structures, milling asphalt concrete, pavement patching, asphalt concrete overlay, and related work. Parish(es): Vernon Route(s): US 171 Federal Number: H014107 Estimated Construction Cost: $2,500,000 to $5,000,000 All questions concerning the plans shall be submitted via the Electronic Plans Distribution Center known as Falcon. All submitted questions will be forwarded by email to the Project Manager and the Project Engineer. Questions submitted within a period of 96 hours prior to the advertised time for the opening of bids, excluding Saturdays, Sundays, and any other legal holidays, may not be answered prior to bidding. Falcon may be accessed via the Internet. From the home page, select BUSINESS Working With DOTD, then select Project Letting Info. On the Construction Letting Information page, select the link, DOTD Plan Room (Falcon); Login to Falcon (or request an ID if a first-time user). Once logged in, you will have access to view Project Information, submit a question concerning the project, and view the plans. To avoid any suggestion that a potential bidder is using the Falcon system to communicate with other potential bidders, DOTD will not post any question or any statement of fact or opinion not made for the purpose of seeking clarification of plans and/or specifications. Any non-questions posted on falcon will be limited to the statement of an issue considered unresolved by a previous DOTD response. LADOT - Us 171: Schweitzer Ave to La 28

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents