Similar Projects
Last Updated | 09/24/2019 06:51 AM |
Project Title | Supplying and Installing Standing Seam Metal Roofs for Two (2) Buildings |
Physical Address | View project details and contacts |
City, State (County) | Haslett, MI 48840 (Ingham County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1) Acquiring all necessary permits. 2) Thoroughly striping and cleaning the roof of all existing roofing materials and preparing the roof for the metal roof installation. 3) Environmentally disposing of all existing roofing materials and hauling away at Contractor’s expense. 4) Both roofs have existing tongue and groove underlayment. Remove, replace, and install any T & G sheathing that is damaged or in poor condition. Use the attached Cost Form to quote your cost per square foot to replace sheathing, if necessary. 5) Contractor is to put a course of OSB (minimum of 7/16” thickness) sheathing over existing tongue and groove sheathing in a manner consistent with building code. 6) Contractor repairing roofing boards/sheathing as necessary and determined by the Contractor and Park Manager. Use the attached Cost Form to quote your cost per square foot to replace sheathing, if additional is necessary after tear off. The existing skylights on Snell bathrooms are to be removed and NOT replaced. Total bid price for this roof should include removal, replacement, and installation of matching thickness T & G sheathing in place of skylights. For both buildings removal, disposal, replacement and installment of all sheathing that is damaged or in poor condition for the Lakeview Picnic Shelter. Contractor must use appropriate thickness of sheathing as determined by the spacing of the rafters by building code. 7) Supplying all roofing materials, including but not limited to, metal roofing, ridge caps, underlayment, nails/screws, lumber, drip edge, ice and water barrier, snow bars, eave troughs and screws, and flashing. No nails or screws shall extend through the tongue and groove underlayment so that it can be seen from underneath. 8) Installing synthetic underlayment on entire roof deck. The underlayment acts as a strong water barrier if sweating occurs. The slip sheet also allows the metal roof to expand and contract without rubbing on the underlayment course. 9) Remove the old drip edge and install new drip edge on the building eaves and rakes to match new roof color. Custom fabricate, from 24-inch metal coil stock, all drip edge, rake detail, valleys, ridge & hip cap, and all other metal accessories to match the color of the roof panels. Furnish and install snow guards over doorways to stop unwanted avalanches where warranted. Color to match metal roof panels. Furnish and install premium roof boots for plumbing standpipe(s) with a warranty to match the life of the roof material. Location: Lake Lansing South County Park (1621 Pike Street, Haslett, MI) – 1 roof Building Information: 1) Lakeview Picnic Shelter Approximately 38’x 24’ Flying gable ends Tongue and groove underlayment 5/12 pitch Lake Lansing North County Park (6260 East Lake Drive, Haslett, MI) – 1 roof Building Information: 2) Snell Restroom Facility Approximately 34’x 23’ Flying gable ends Tongue and groove underlayment 5/12 pitch | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |