Similar Projects
DTMB / Kinross Correctional - Various Roof Repairs/Replacements
Post-Bid
Lansing, MI

Roofing
Post-Bid
Less than $135,000 est. value
Holt, MI

Various Roof Restorations, Charles E. Egeler Correctional Facility
Results
Less than $1,244,757 est. value
Lansing, MI

Roof Replacement at the Ingham County Road Department Eastern Garage
Results
Less than $159,400 est. value
Williamston, MI

National Roofing Program (NRP) Design/Build 88th
Post-Bid

Supplying And Installing Standing Seam Metal Roofs For Six (6) Buildings
Results
Less than $112,100 est. value
Mason, MI

National Roofing Program (NRP) Design/Build Nationwide
Post-Bid

Supplying and Installing Standing Seam Metal Roof
Results
Lansing, MI 48910

Waverly Schools Sidewalk, Roofing and Water Main
Post-Bid
Lansing, MI 48917

Flat Roof Replacement
Results
Lansing, MI 48911

Chief Noonday - 8 Roof Replacements
Post-Bid
Lansing, MI

Shingle Roof Replacement- Multiple Facilities
Results
Lansing, Marion, MI 49665

MSU Surplus and Recycling – Replace Roof 1
Post-Bid
East Lansing, MI

Roof Replacement at the Ingham County Road Department Western Garage
Results
Less than $248,750 est. value
Mason, MI

MATOC - Army Reserve National Roofing Program (NRP)
Post-Bid
Less than $95,000,000 est. value

Last Updated 09/24/2019 06:51 AM
Project Title

Supplying and Installing Standing Seam Metal Roofs for Two (2) Buildings

Physical Address View project details and contacts
City, State (County) Haslett, MI 48840   (Ingham County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 1) Acquiring all necessary permits. 2) Thoroughly striping and cleaning the roof of all existing roofing materials and preparing the roof for the metal roof installation. 3) Environmentally disposing of all existing roofing materials and hauling away at Contractor’s expense. 4) Both roofs have existing tongue and groove underlayment. Remove, replace, and install any T & G sheathing that is damaged or in poor condition. Use the attached Cost Form to quote your cost per square foot to replace sheathing, if necessary. 5) Contractor is to put a course of OSB (minimum of 7/16” thickness) sheathing over existing tongue and groove sheathing in a manner consistent with building code. 6) Contractor repairing roofing boards/sheathing as necessary and determined by the Contractor and Park Manager. Use the attached Cost Form to quote your cost per square foot to replace sheathing, if additional is necessary after tear off. The existing skylights on Snell bathrooms are to be removed and NOT replaced. Total bid price for this roof should include removal, replacement, and installation of matching thickness T & G sheathing in place of skylights. For both buildings removal, disposal, replacement and installment of all sheathing that is damaged or in poor condition for the Lakeview Picnic Shelter. Contractor must use appropriate thickness of sheathing as determined by the spacing of the rafters by building code. 7) Supplying all roofing materials, including but not limited to, metal roofing, ridge caps, underlayment, nails/screws, lumber, drip edge, ice and water barrier, snow bars, eave troughs and screws, and flashing. No nails or screws shall extend through the tongue and groove underlayment so that it can be seen from underneath. 8) Installing synthetic underlayment on entire roof deck. The underlayment acts as a strong water barrier if sweating occurs. The slip sheet also allows the metal roof to expand and contract without rubbing on the underlayment course. 9) Remove the old drip edge and install new drip edge on the building eaves and rakes to match new roof color. Custom fabricate, from 24-inch metal coil stock, all drip edge, rake detail, valleys, ridge & hip cap, and all other metal accessories to match the color of the roof panels. Furnish and install snow guards over doorways to stop unwanted avalanches where warranted. Color to match metal roof panels. Furnish and install premium roof boots for plumbing standpipe(s) with a warranty to match the life of the roof material. Location: Lake Lansing South County Park (1621 Pike Street, Haslett, MI) – 1 roof Building Information: 1) Lakeview Picnic Shelter Approximately 38’x 24’ Flying gable ends Tongue and groove underlayment 5/12 pitch Lake Lansing North County Park (6260 East Lake Drive, Haslett, MI) – 1 roof Building Information: 2) Snell Restroom Facility Approximately 34’x 23’ Flying gable ends Tongue and groove underlayment 5/12 pitch
Details
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents