Similar Projects
Center Street Arch - City of Provo
Infrastructure
Conception
$1,000,000 est. value
Provo, UT 84601

1130 North Drainage Improvements - City of Saint George
Infrastructure
Conception
$1,400,000 CJ est. value
St George, UT 84770

Lakeview Business Park
New Construction
Design
$1,500,000,000 est. value
Tooele, UT 84074

Harvey Well Deepening Project
Infrastructure
Design
$170,000 CJ est. value
Cedar Hills, UT 84062

Antelope Island State Park, White Rock Bay Campground
Infrastructure
Bidding
$6,800,000 CJ est. value
Syracuse, UT 84075

Jones Hole National Fish Hatchery - Water System Improvements
Infrastructure
Bidding
$150,000 CJ est. value
Vernal, UT 84078

State Bank Facility / St. George
New Construction, Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
St George, UT 84790

RFQ D/B - West 388th/419th Fighter Wing Apron at Hill Air Force Base
Term Contract, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Hill Air Force Base, UT 84056

Beaver Mountain Old BSA Gun Range Cleanup
Alteration
Post-Bid
UT

Ferron and Huntington Creek Stabilization
Results
Castle Dale, UT 84513

Reclamation Construction for Overland 2 Project
Results
Less than $350,000 est. value
Salt Lake City, UT

Red Bridge - Pid Super Pad
Alteration
Pending Verification
Orem, UT

Salt Lake City Department of Public Utilities (SLCDPU) - New Water Reclamation Facility (WRF) Project Liquid Train - Package 2
New Construction, Infrastructure
Pending Verification
$600,000,000 CJ est. value
Salt Lake City, UT 84111

Windsor Park - City Of Orem
Infrastructure
Conception
$569,000 CJ est. value
Orem, UT 84057

Installation of Water and Wastewater Services for Ute Tribe Water Systems
Infrastructure
Design
$160,000 CJ est. value
Fort Duchesne, UT 84026

Last Updated 08/25/2022 03:02 PM
Project Title

CICWCD Test Well and Vandenberghe Well Projects

Physical Address View project details and contacts
City, State (County) Cedar City, UT 84720   (Iron County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of 8/25/2022, no bids were received on this project. A timeline for the rebid is not available at this time. Well drilling, well retrofitting, casing installation, sanitary surface seal, 24-hour drawdown testing and documentation respectively will all be made in accordance with the drawings and specifications, together with all appurtenances and related work, and restoration of existing improvements removed or damaged as a consequence of the construction. Bid security in the amount of 5% of the base bid will be required to accompany bids. The Project must meet Federal requirements concerning Equal Employment Opportunity / Affirmative Action Requirements (EEO/AAR) and State of Utah Department of Environmental Quality, Air Quality Regulations (including R307-205 Emission Standards: Fugitive Emissions and Fugitive Dust, and R307-309 Fugitive Emissions and Fugitive Dust, of the Utah Air Conservation Rules). All communication relative to the Project shall be directed to the ENGINEER prior to the opening of bids at: Ensign Engineering 88 E Fiddlers Canyon Rd, Suite 210 Cedar City, Utah 84721. Tel: 435.865.1453 Attention: Mr. Justin Christensen, P.E.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents