Similar Projects
Last Updated | 04/17/2023 02:06 AM |
Project Title | Construction for Beale Substation, California |
Physical Address | View project details and contacts |
City, State (County) | Beale AFB, CA 95903 (Yuba County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Military Facility, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected June 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate - 04/27/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | NOTE: All responses to this Invitation for Bid (IFB) shall be submitted electronically to Dana Kostel at kostel@wapa.gov and Jolene Daoud at Daoud@wapa.gov. The Western Area Power Administration (WAPA), Sierra Nevada Region (SNR) has a requirement for a Contractor to provide labor, materials, tools, equipment, transportation, and other resources necessary to complete this project. The work will consist of building a new substation in accordance with the IFB, Project Specifications, Project Drawings and other required information . The project location is in Beale Air Force Base, Yuba County, CA 95903, and the anticipated period of performance is from date of Notice to Proceed through May 31, 2024 The estimated magnitude of construction is over $10.0 million. FAR Part 14 is being utilized for this requirement. The solicitation will be issued as a 100% small business set-aside. The applicable NAICS Code is 237130; Size Standard is $45.0M. The solicitation including specifications and drawings will be issued electronically on or about 27 April 2023 at the following sites: https://www.fedconnect.net and https://www.sam.gov. NOTE: The Buy American Act applies to the solicitation. Refer to FAR Clause 52.225-9 (Section I) and FAR Provision 52.225-10 (Section L) if any non-domestic material will be proposed. Bidders must identify any non-domestic materials (not manufactured in United States) included in their bid. Please check with your suppliers and subcontractors to verify whether or not their quotes include non-domestic material. The method of contractor has not determined at this time. |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |