Similar Projects
Verdae Swamp Rabbit Trail (SRT) Underpass - City of Greenville
Infrastructure
Conception
Less than $2,000,000 est. value
Greenville, SC 29601

Taxiway J Rehabilitation - Construction - City of Rock Hill
Infrastructure
Conception
$964,280 CJ est. value
Rock Hill, SC 29732

AASF, Mcentire - Runway Centerline Pavement Repair Design
Infrastructure
Post-Bid
$500,000 to $750,000 est. value
Eastover, SC

Airfield Pavement Improvements Priorities 2 and 4
Infrastructure
Post-Bid
Greer, SC

Rubber Removal and Paint Stripping
Results
$1,000,000 to $5,000,000 est. value
North Charleston, SC

Southern Parallel Taxiway Rehabilitation
Infrastructure
Results
Bennettsville, SC 29512

West Side Corporate Taxilane - Construction - City of Rock Hill
Infrastructure
Conception
$550,850 CJ est. value
Rock Hill, SC 29732

Apron and Taxiway Pavement Rehabilitation Project - Union County Airport
Infrastructure
Post-Bid
Union, SC 29379

Perimeter Guard Shack Upgrade
New Construction
Results
Columbia, SC

Terminal Landside Roadway Improvement Project Construction Manager as Constructor
Infrastructure
Post-Bid
Greer, SC 29651

Runway Pavement Rehabilitation
Infrastructure
Results
$700,000 est. value
Seneca, SC 29678

Greenville-Spartanburg Airport District (GSP) Contract Documents and Technical Specifications General Aviation Site 1A Paving
Infrastructure
Post-Bid
$2,254,779 CJ est. value
Greer, SC 29651

Runway Pavement Rehabilitation and Crossfield Apron and Taxiway Development
Infrastructure
Results
$2,000,000 est. value
Liberty, SC 29657

South Apron Expansion Project - Ridgeland-Claude Dean Airport
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Ridgeland, SC 29936

Track Runway Repair
Infrastructure
Results
$400,000 est. value
Santee, SC 29142

Last Updated 01/10/2023 04:35 PM
Project Title

Terminal Apron Rehabilitation Columbia Metropolitan Airport

Physical Address View project details and contacts
City, State (County) West Columbia, SC 29170   (Lexington County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $2,313,822 [brand] Estimate
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 22, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** All prospective bidders, including prospective subcontractors are hereby notified that they must have proper contracting licenses under state law for their trades at the time bids are received. General Contractors are notified that applicable statutes of South Carolina will be observed in receiving and awarding general contracts. The General Contractormust have his license number clearly printed or typed on the sealed bid envelope. The Owner will not accept or consider proposals from any contractor whose name, at the time of opening of bids or award, appears on the then-current list of ineligible contractors published by the Comptroller General of the United States under Section 5.6 (b) of theRegulations of the Secretary of Labor (29) CFR nor a proposal fromany firm, corporation, partnership, or proprietorship in which an ineligible contractor who, at the time of the opening of bids or the award, is removed fromthe Department of Transportation's list of prequalified contractors Each bid shall be accompanied by a bid guaranty consisting of a cash deposit, or a certified check drawn on a bank or trust company insured by the FDIC, or a bid bond executed by a surety company licensed under the laws of South Carolina to execute such bonds. Such Bid guaranty shall be in an amount not less than 5% of the total amount of the bid and will be retained by the Owner as liquidated damages should the successful bidder fail to properly execute the Contract within ten (10) days after the award and to give satisfactory surety as required by law. By submitting a bid, the Contractor certifies that he has under his direct control, or at his disposal, the men, equipment, and materials required to execute this work as specified. Lack of such control or availability of men, equipment, or materials shall constitute failure to properly execute the Contract. Performance and Labor and Material Payment Bonds will be required for 100% of the Contract price, with a surety or sureties legally authorized to do business in South Carolina. A DBE contract goal of 12% has been established for this contract. The Owner reserves the right to reject any or all bids and to waive informalities and minor irregularities. Cutoff for questions is Monday, March 28, 2022, at 5:00 PM. Any questions prior to the pre-bid meeting may be submitted to W.K. Dickson at tking@wkdickson.com. All questions after the pre-bid meeting, held on March 22, 2022, must be submitted to W.K. Dickson in writing via e-mail at cbirkmeyer@wkdickson.com

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents