Similar Projects
Infrastructure Improvements Projects-Construction Qualifications
Term Contract
Bidding
Southfield, MI

Catch Basin Cleanout
Post-Bid
Reed City, MI 49677

Drop Shaft and Connecting Sewer Rehab-ST-S-4, ST-S-5 and UT-S-1
Post-Bid
Clinton Township, MI

Bedford SRF Manholes and Sewer Improvements
Results
Less than $1,750,000 est. value
Monroe, MI

Street and Utility Improvements - Washington Street and Dye Street
Results
Less than $1,362,523 est. value
Ionia, MI

Sanitary Sewer Rehabilitation Project
Construction
Less than $200,000 est. value
South Rockwood, MI

Grinder Pump Installs and Sanitary Sewer Repairs
Term Contract
Post-Bid
Brighton, MI 48114

Sanitary Sewer Repairs
Results
Less than $60,000 est. value
Wyandotte, MI

Two (2) Years – Hydrant, Grate and Manhole Cover Parts
Term Contract
Post-Bid
Flint, MI

Catch Basin Clean Out
Results
Hillsdale, MI

Trough Drain Maintenance
Post-Bid
Sandusky, MI

Royal Oak Township Sanitary Sewer Rehabilitation
Results
Less than $378,574 est. value
Royal Oak, MI

Big Creek Drain Maintenance
Post-Bid
Sandusky, MI

2019-2022 Sewer Cleaning and Video Inspection Service
Results
Port Huron, MI

Cargill and BRS Drain Maintenance
Post-Bid
Sandusky, MI

Reported 03/18/2020 07:16 AM
Project Title

Bush Road Community Sewer – Green Lake Township

Physical Address View project details and contacts
City, State (County) Interlochen, MI   (Grand Traverse County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed collection system design will include a Septic Tank Effluent Pumping (STEP) system for 20 of the 24 homes in the Special Assessment District plus will include one lateral stub to the remaining four (4) parcels. Each homeowner will be responsible to supply power and an external disconnect switch for each individual control panel. A low-pressure sewer line will be installed via directional drill methods along Bush Road to serve the 24 parcels and will be located within the Bush Road ROW. Depths of sewers are expected to be approximately 6 feet. Each home will have a lateral connecting the STEP chamber to the main and a shutoff valve. Dewatering will be required where laterals are connected to the force main and where new STEP chambers are to be installed. An air release valve and four cleanouts will be installed on the low pressure main.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents