Similar Projects
Mental Health Anti Ligature Door Sensors Gen 3 Upgrade Project 623-22-105
Term Contract
Design
$100,000 to $250,000 est. value
Muskogee, OK 74401

Window Replacement
Renovation
Design
$280,000 CJ est. value
Lawton, OK 73505

Remove and Replace Vestibule
Alteration
Post-Bid
Duncan, OK 73533

Overhead Door
Term Contract
Post-Bid
McAlester, OK 74501

Window and Door Replacement
Alteration
Results
Kiowa, OK 74553

Window Repair and Replacement and Paint Building 6
Term Contract
Results
El Reno, OK 73036

Replace Store-Front Doors - Carson Engineering
Alteration
Post-Bid
Norman, OK 73019

Hangar Door Inspections and Repair
Alteration
Results
$10,000 est. value
Tulsa, OK 74115

Replace Storefront Door Entries - GLCH
Alteration
Post-Bid
Norman, OK 73019

ADA Compliant Touchless Door Operators for Public Restrooms and Outpatient Clinics
Alteration
Results
Lawton, OK

Entry Doors Replacement
Term Contract
Post-Bid
Oklahoma City, OK 73131

Fire Station No 25 Bay Door Modifications
Renovation
Results
Oklahoma City, OK

Mccasland Field House Add Exterior Windows
Term Contract, Alteration
Post-Bid
Norman, OK 73019

Animal Welfare Door Replacement
Alteration
Results
$112,000 est. value
Oklahoma City, OK

Command Post Entrapment Door F500
Alteration
Post-Bid
Enid, OK 73703

Last Updated 08/30/2022 07:37 AM
Project Title

Cedar Lake Bathhouse Door Replacement and Door Painting

Physical Address View project details and contacts
City, State (County) Hodgen, OK 74939   (Le Flore County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide all labor, tools, equipment, and materials to remove ten doors (doors, door frames, trim, and accessories) and install new doors (doors, door frames, trim, and accessories), paint new doors plus four more existing doors, and work related in accordance with the specifications for the Cedar Lake Bathhouse Door Replacement and Door Painting per the attached specifications.The statement of magnitude is between $25,000-$50,000. Payment and performance bonds are required. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents