Similar Projects
Art In Motion Charter School
Renovation, Addition - 111,000 SF
Conception
Chicago, IL 60649

Kenneth D. Bailey Academy Expansion
Addition
Conception
Danville, IL 61832

Jesuit Academy Expansion
New Construction, Addition, Demolition, Alteration - 50,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Chicago, IL 60644

New Hope Academy Expansion
Build-Out - 9,600 SF
Design
Arlington Heights, IL 60004

2023 Fremont Middle School Classroom Upgrades
Renovation
Bidding
$230,000 CJ est. value
Mundelein, IL 60060

General Remodeling Project at Central and East High Schools
Build-out
Bidding
$2,260,000 CJ est. value
New Lenox, IL 60451

2023 Zion-Benton High School Renovations (Phase 1)
Renovation
Sub-Bidding
$3,850,000 CJ est. value
Zion, IL 60099

Bremen High School Welding Shop Remodeling
Build-out
Sub-Bidding
$300,000 CJ est. value
Midlothian, IL 60445

Cloverdale ES New Innovative Center
Renovation
Results
Carol Stream, IL 60188

DeKalb HS Video Production Studio
Renovation
Results
DeKalb, IL 60115

Kankakee Junior High School 2022
Renovation, Addition
Construction
Kankakee, IL 60901

LIFT Innovation Center
Renovation - 49,700 SF
Construction
Mattoon, IL 61938

New Junior High School
New Construction - 140,000 SF
Conception
$57,000,000 est. value
Mahomet, IL

2022 November Bond Referendum - Long Range Phase 2 - North Shore District 112
Renovation
Design
$108,400,000 est. value
Highland Park, IL

2023 General Remodeling at Oak Lawn Community High School
Build-out
Bidding
$4,000,000 CJ est. value
Oak Lawn, IL 60453

Last Updated 01/24/2023 03:20 PM
Project Title

New 5-8th Grade School - Minooka Community Consolidated School

Physical Address View project details and contacts
City, State (County) Minooka, IL 60447   (Grundy County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Project Delayed, Construction start expected January 2025
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes plans to build one new 5-8th grade school. As of January 24, 2023, this project is in the conceptual phase and pending funding. A bond election April 2, 2019 did not pass. The owner has not made a determination regarding the next bond referendum. An architect has not been selected. A firm timeline for construction has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *This project is on hold due to the public health crisis. A new timeline has not been established.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents