Similar Projects
Police Station HVAC
Renovation
Design
$300,000 CJ est. value
Hubbardston, MA 01452

HVAC Modification at Athol High School
Renovation
Sub-Bidding
$220,000 CJ est. value
Athol, MA 01331

QCC Harrington Learning Center Cooling Tower
Alteration
Post-Bid
Worcester, MA 01606

HVAC Upgrade - Parking Garage
Alteration
Post-Bid
Leominster, MA 01453

Roof Fan Replacement at Memorial and Reingold Schools - SUB Bid
Alteration
Results
Fitchburg, MA 01420

Roof Fan Replacement at Memorial Middle School and Reingold Elementary Schools - General Bid
Alteration
Results
Fitchburg, MA 01420

Heating Emergency Assistance Retrofit Task Weatherization Assistance Program - Heating System Service Contractors
Renovation
Pending Verification
$300,000 CJ est. value
Worcester, MA 01608

Heating Emergency Assistance Retrofit Task Weatherization Assistance Program - Chimney Service Contractors
Renovation
Pending Verification
$50,000 CJ est. value
Worcester, MA 01608

Furnishing and installation of Supplemental Server Room Cooling
Alteration
Post-Bid
$30,000 est. value
Worcester, MA 01605

HVAC Modifications - RECC / E.C
Alteration
Results
$200,000 est. value
Worcester, MA 01603

Fluid and Air Distribution Systems
Alteration
Post-Bid
Worcester, MA 01606

Shrewsbury High School Exhaust Fan Replacement
Alteration
Results
$70,000 est. value
Shrewsbury, MA

Replacement of the Existing Air Handling Units, Condensing Units and Select other Equipment - General Bid
Alteration
Post-Bid
$391,500 est. value
Spencer, MA 01562

FMC Devens- Water Treatment Services
Term Contract
Results
Ayer, Devens, MA 01434

Electric Baseboard To ASHP - Phase 1, Checkerberry Village 667-1- General Bids
Alteration
Post-Bid
$496,000 est. value
Holden, MA

Last Updated 03/29/2023 02:13 PM
Project Title

Haley Cooling Tower Basins

Physical Address View project details and contacts
City, State (County) Gardner, MA 01440   (Worcester County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $68,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes all labor and materials to replace hot water basin on Marley NC8304 Cooling Tower 1 and Marley NC8304 Cooling Tower 2 located on the roof of the Haley Building. Scope of work: 1. All work to be done in accordance with the below scope of work provided on the follow page. 2. All materials, fabrics, finish materials and specifications to be included in bid package. 3. Scope of work is for reference only, it is highly recommended for contractor(s) to perform a site visit per the scheduled site visit. 4. All questions will be presented to Glen Fox, Director of Facilities Management (978-630- 6267) Scope of Work General Scope: The scope of work includes all labor and materials to replace hot water basin on Marley NC8304 Cooling Tower #1 and Marley NC8304 Cooling Tower #2. Additional information and photos are available below, but it is highly recommended to attend site visit scheduled March 22, 2023 at 9:00 AM. Cooling Tower #1 Replacement of hot water basin on Marley NC8304 Cooling Tower 1 located on the roof of the Haley Building. Materials to include but not limited to: basins, basin covers, nozzles, gaskets, sealer and associated hardware. Original hot water basin is corroded and has large holes and missing nozzles. This scope consists of rigging and installing new Marley factory replacement basin kit, front and back wall, distribution box and flume. Factory start up and disposal of all old material must be included in the bid. Cooling Tower #2 Replacement of hot water basin on Marley NC8304 Cooling Tower 2 located on the roof of the Haley Building. Materials to include but not limited to: basins, basin covers, nozzles, gaskets, sealer and associated hardware. Original hot water basin is corroded and has large holes and missing nozzles. This scope consists of rigging and installing new Marley factory replacement basin kit, front and back wall, distribution box and flume. Factory start up and disposal of all old material must be included in the bid. Requests for Interpretation: A: Bidders shall promptly notify the Awarding Authority of ambiguity, inconsistency or error which may be discovered upon examination of the Contract Documents, the site, and local conditions. B: Bidders requiring clarification or interpretation of the Contract Documents shall make a request to the Owner/Architect. The Owner/Architect will answer requests, in writing via addendum, if received not later than seven (7) calendar days before the date for receipt of the bids. All questions should be submitted in writing via email to gfox1@mwcc.mass.edu C: Interpretation, correction or change in the Contract Documents will be made by an Addendum which shall become part of the Contract Documents. Not later than 3 calendar days prior to receipt of bids, Addenda will be delivered by electronic mail to every individual or firm on record as having Contract Documents via regular mail. Failure of the Owner or Architect to send, or of a Bidder to receive, Addenda, will not relieve the Bidder from obligation under a bid as submitted. D: Throughout the bidding and construction process, interpretations which affect the cost of the Work shall be made in writing. Neither the Awarding Authority nor the Architect shall be responsible for oral instructions or oral interpretations. Verbal instructions or interpretations shall not be cause to amend the contract price or bid

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents