Similar Projects
CSN West Charleston Building G Fume Hood Installation
Alteration
Bidding
$100,000 est. value
Las Vegas, NV 89146

Fume Hood
Post-Bid
Las Vegas, NV

Replace Ductwork In Dehumidifiers
Post-Bid
Las Vegas, Nelson, NV

J045--Chiller Comprehensive Service and Maintenance
Results

SWRF Untreated Air Pipe Replacement
Results
$1,225,000 est. value
Henderson, NV

HVAC Air Filter Replacement Service
Alteration
Post-Bid
NV

West Charleston Building C - 2nd Floor HVAC Replacement Phase A
Results
$319,000 est. value
Las Vegas, North Las Vegas, NV 89146

99 Ces Replacement Boiler Building 777
Term Contract
Post-Bid
Nellis AFB, Nellis Air Force Base, NV 89191

West Flamingo Senior Center Pool Locker Room HVAC Upgrade
Results
$126,350 to $133,000 est. value
Las Vegas, NV

Central Plant Renovation, High Desert State Prison
Alteration
Post-Bid
$7,300,000 est. value
NV

45--Supply and Replace HVAC Units
Results
Bullhead City, AZ - Boulder City, Echo Bay, NV 89005

90 Ton High Ambient Air-Cooled Chiller
Alteration
Post-Bid
Las Vegas, NV 89106

UNLV CBC-C 1st and 2nd Floor Repipe
Results
$820,000 est. value
Las Vegas, NV 89154

Replace HVAC Components, Roof, and Security Walter Johnson Junior High School Academy of International Studies
Alteration
Post-Bid
$7,614,477 est. value
Las Vegas, NV 89145

Big Bend Water Treatment Plant Ozone Generator Room HVAC Upgrade
Results
$182,681 est. value
Las Vegas, NV

Last Updated 10/13/2021 08:32 AM
Project Title

SWRF Activated Carbon Media Replacement

Physical Address View project details and contacts
City, State (County) Henderson, NV 89074   (Clark County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacing and installation of the activated carbon media in the Headworks Air Treatment System and the Membrane Air Treatment System at the City’s Southwest Water Reclamation Facility (SWRF). These air treatment systems contain a total of six (6) activated carbon air treatment vessels.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents