Similar Projects
Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Address Pavement Condition of Louie B. Nunn Cumberland Parkway
Infrastructure
Conception
$4,400,000 CJ est. value
Glasgow, KY 42141

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Partial Parallel Taxiway
Infrastructure
Bidding
$400,000 CJ est. value
Columbia, KY 42728

Main Street Improvements-Phase 2
Infrastructure
Bidding
$1,800,000 CJ est. value
Florence, KY 41042

Emergency Replacement Water Transmission Main Crossing
Infrastructure
Post-Bid
Catlettsburg, KY

AMR/AMI Water Meters and Existing Software Upgrades
Infrastructure, Alteration
Post-Bid
Cloverport, KY

Baseball Field Backstop Safety System
Results
Union, KY 41091

42" Raw Water Line Rehabilitation at Water Treatment Plant
Infrastructure
Results
Ashland, KY

Union Promenade
New Construction, Infrastructure - 155,000 SF
Construction
$150,000,000 CJ est. value
Union, KY 41091

Florence Apartments
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Florence, KY 41042

Residence Inn by Marriott / Florence
New Construction, Infrastructure - 104,321 SF
Pending Verification
$20,000,000 CJ est. value
Florence, KY 41042

Turfway Foodmart
Addition, Demolition, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Florence, KY 41042

Skilcraft Expansion
Addition, Infrastructure - 22,000 SF
Conception
$8,400,000 CJ est. value
Hebron, KY 41048

Last Updated 04/27/2023 11:24 AM
Project Title

Clay City Phase II Sewer System Rehab Project

Physical Address View project details and contacts
City, State (County) Clay City, KY 40312   (Powell County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Clean and CCTV approximately 15,500 LF of sewer line and locate existing manholes. Bids will be received for a single prime Contract. Bids shall be on a unit price basis, unless otherwise noted. The owner reserves the right to waive any informalities or to reject any or all bids No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Bid award will be made to the lowest, responsive, responsible bidder. All bidders shall submit with their bid an acceptable bid bond or certified check in the amount of five percent (5%) of the bid, payable to the Owner. The Bidder awarded the contract shall complete this project within 60 calendar days of the construction start date. Liquidated damages will be assessed at $750 per calendar day. Questions regarding this project must be received by Nesbitt Engineering, Inc. (bgreenwell@neiky.com) in writing no later than 5:00 pm on 04/05/2023. Sewer System Rehabilitation Phase 2 This project will be phase 2 of an SSES program to include the tv inspection and smoke testing of approximately 15,500 LF of sewer line and a report of findings with rehabilitation recommendations for the phase 2 sewer rehabilitation project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents