Similar Projects
Hodgeville Booster Pump Station
New Construction
Bidding
GA

Loganville Water Transmission System Improvements
Bidding
Loganville, GA 30052

Towne Lake and Benton Lift Station Upgrade and Sewer Infrastructure
Post-Bid
Pooler, GA 31322

Lift Station No. 7 Improvements
Post-Bid
Less than $385,000 est. value
Thomasville, GA 31792

Phase I Entrance Road
Results
Savannah, GA 31400

Chattahoochee River Intake Pump Station
Results
Atlanta, GA 30303

Rocky Creek Trunk Sewer Pumping Station
Construction
Augusta, GA 30900

Central Avenue Lift Station Rehabilitation Project
Renovation
Bidding
Savannah, GA 31406

Peachtree Mobile Home Park Pump Station Improvements
Post-Bid
Sugar Hill, GA

SEDA Manufacturing Center Master Lift Station and Force Main and Offsite Water Extension
Results
Less than $5,338,048 est. value
Savannah, GA

PS4036 Gravity Basin CIPP Rehabilitation
New Construction
Bidding
Brunswick, GA 31520

Chemical Feed System Installation
Post-Bid
College Park, GA

South Cobb WRF Influent Lift Station Recovery - Construction Management Services
Results
Marietta, GA 30060

Pump Station Bypass Connections
New Construction, Term Contract
Bidding
Thomson, GA 30824

Water Line, Sewer Line, Lift Station
Post-Bid
Waynesboro, GA

Last Updated 06/03/2020 11:50 AM
Project Title

Brooks Road Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA 30045   (Gwinnett County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Modifications to the existing Brooks Road PS including mobilization and demobilization, bypass pumping, demolition of facilities to be removed, coating of the existing wet well, installation of three (3) new wet well and three (3) new dry well pumps, installation of a channel grinder, removal of existing medium voltage electrical system and replacement with new 480 volt system, installation of a new 2000 kW emergency generator and secondary containment, control system modifications, associated site improvements and other facility upgrades per contract documents, erosion control and site stabilization, and all related appurtenances for a complete and functioning system.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents