Similar Projects
Plumbing Services
Alteration
Post-Bid
Salt Lake City, UT

HVAC and Plumbing
Term Contract
Post-Bid

Salt Lake Airport On-Call Plumbing Services
Alteration
Results
$25,000 to $150,000 est. value
Salt Lake City, UT

DFCM Construction Pre-Qualified Mechanical - Snow College Business Bldg Plumbing Upgrades
Alteration
Results
$218,000 est. value
Ephraim, UT 84627

New Construction of Residential Building - Plumbing
Alteration
Post-Bid
Blanding, UT 84511

UDC Plumbing Services
Alteration
Results
Ogden, UT 84401

Sand Filter Replacement with Defender Units
Alteration
Post-Bid
Saint George, UT 84770

Peterson Heritage Center Waste Water Piping Replacement
Alteration
Results
$510,000 est. value
Salt Lake City, UT 84112

Plumbing Fixtures
Term Contract
Post-Bid
Salt Lake City, UT

Division of Juvenile Justice Services Millcreek Youth Detention Center Shower/Plumbing Fixture Upgrade
Alteration
Results
$329,291 est. value
Ogden, UT 84404

HVAC and Plumbing Services
Alteration
Post-Bid
Salt Lake City, UT

20A: 3500 South to 4100 South Redwood Road Sewer
Infrastructure
Results
$12,552,242 CJ est. value
Salt Lake City, UT 84129

Mechanical, Plumbing, and Electrical Systems at Pleasant Creek School
Alteration
Post-Bid
$200,000 est. value
Mount Pleasant, UT 84647

Town of Garden City South Well
Infrastructure
Post-Bid
$650,000 CJ est. value
Garden City, UT 84028

Bathtub and Counter Refinishing
Term Contract
Post-Bid
Salt Lake City, UT

Last Updated 01/04/2023 06:31 PM
Project Title

12200 South Sewer Upsizing Project

Physical Address View project details and contacts
City, State (County) Draper, UT 84020   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $2,832,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bids will only be accepted from Bidders who have been pre-qualified for the Project. The Work includes upsizing of the existing sewer line in accordance with the contract documents. The work includes Installation of 1,445 feet of 15" PVC Sewer Pipe and 20 feet of 8" PVC Sewer Pipe, trenchless installation of 120 LF of 30" steel casing, installation of 7 sewer manholes, removal of existing 10" sewer pipe and sewer manholes, reconnecting sewer laterals, and all appurtenant items, in accordance with the Contract Documents Bids (on the Bid form and Bid Schedule form) must be accompanied by a Bid Bond in conformance with the Instructions to Bidders and in the amount of five percent (5%) of the Bidder's Bid naming the District as Obligee. Bids must also be accompanied by a completed Information Required of Bidder and any other documents and information which may be required by the Instructions to Bidders to be submitted with the Bid. The Contractor shall achieve Substantial Completion of the entire Work on or before March 15, 2023 and the entire Work shall be finally completed and ready for final payment in accordance with all requirements of the Contract Documents on or before April 15, 2023 or not later than forty-five (45) days after Substantial Completion of the entire Work if no date is set forth herein. Question Submission Close Date 12/12/2022 5:00 PM MST If you need more information on this event, please contact: Matthew Garn +1 801-617-1057 matthewg@svsewer.com

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents