Similar Projects
Old Dominion Freight Line Warehouse Expansion
Addition
Conception
Saint Charles, MO 63301

Storage Building
New Construction
Conception
$1,000,000 est. value
Monroe City, MO

Cornerstone Subdivision Lot C
New Construction, Addition - 6,560 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Saint Peters, MO

Cargo Largo Retail Stores
New Construction - 531,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Independence, MO

State Tech-Commercial Turf and Grounds Center
New Construction
Bidding
Linn, MO

LCTC Storage Building Remodel
Renovation
Post-Bid
Lamar, MO

Truckmovers
New Construction - 21,445 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Springfield, MO 65802

Metal Sided Outbuildings
New Construction
Results
Saint Charles, MO

Salt Shed Floodproofing
Results
Ferguson, MO 63135

Amazon Sort Center
New Construction
Pending Verification
Berkeley, MO 63134

KKJ Wholesale Manufacturing & Warehouse
New Construction
Pending Verification
Springfield, MO 65802

Corporate Parkway Business Park
New Construction - 75,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Wentzville, MO 63385

Normandy Fabric Structure Repair
New Construction
Post-Bid
Jefferson City, MO 65109

Cass County Road Maintenance Building
New Construction
Results
Harrisonville, MO 64701

Self-Storage Facility
New Construction
Pending Verification
Springfield, MO 65810

Last Updated 08/07/2021 01:31 AM
Project Title

Unheated Storage Building

Physical Address View project details and contacts
City, State (County) Festus, MO   (Jefferson County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of a new 5,000 square foot pre-engineered metal storage building divided into three separate and equal interior storage spaces with individual man door & overhead door access. The building is not mechanically heated or cooled but is provided with thermostatically controlled ventilation.

Details

Warehouse/Storage, 5,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents