Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Paving Services
Infrastructure
Bidding
$4,000,000 est. value
Tucson, AZ

System Preservation (Engineering)
Infrastructure
Bidding
$2,600,000 est. value
AZ

High Water Crossing at Vamori Wash
Post-Bid
$10,000,000 to $20,000,000 est. value
Tucson, AZ 85746

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Pavement Rehabilitation
Results
Less than $21,640,000 est. value
AZ

Avra Valley Pavement Reconstruction Project - Phase 2
Results
Less than $2,000,000 est. value
Marana, AZ

Rocking K South Infrastructure
New Construction - 14,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Tucson, AZ 85747

Costco #407 Entry Drive Widening
Renovation
Construction
Tucson, AZ 85712

System Preservation (Engineering)
Infrastructure
Bidding
$9,498,000 est. value
AZ

Groundhog Vista Landowners Roadwork
Post-Bid
Tucson, AZ 85743

AZ Flap 62(1), King Canyon Trailhead
Results
$250,000 to $700,000 est. value
Tucson, AZ 85743

System Preservation (Restoration/Rehab/Resurface)
Infrastructure
Bidding
$9,498,000 est. value
Tucson, AZ 85757

Gladden Farms Birchfield Drive and Mikeetter Boulevard (East)
Infrastructure
Post-Bid
Marana, AZ

Skyline Drive at Sunrise Drive Intersection Improvements
Results
Less than $408,966 est. value
Tucson, AZ

Last Updated 01/13/2022 01:38 AM
Project Title

Pavement Preservation.

Physical Address View project details and contacts
City, State (County) AZ   (Pima County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work is located in Pima County on Interstate 10 between milepost 237.47 and 247.89 near Marana. The proposed work consists of removing the existing asphaltic concrete surface course by milling and replacing it with a bonded wearing course overlay

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents