Similar Projects
District 6 on-Call Util Location Service
Infrastructure
Results
Less than $5,000,000 est. value

Lexington Self Storage - Phase 1
Demolition, New Construction, Infrastructure - 81,000 SF
Construction
$1,055,635 CJ est. value
Lexington, NE 68850

Lexington Self Storage - Phase 1
Demolition, New Construction, Infrastructure - 81,000 SF
Construction
$1,055,635 CJ est. value
Lexington, NE 68850

Lexington Self Storage - Phase 2
New Construction - 36,000 SF
Design
$1,400,000 est. value
Lexington, NE

Lexington Self Storage - Phase 3
New Construction, Demolition - 10,000 SF
Design
$351,875 est. value
Lexington, NE

Lexington Veterans Pavilion at Kirkpatrick Memorial Park
Infrastructure
Construction
$1,160,000 CJ est. value
Lexington, NE 68850

Lexington Veterans Pavilion at Kirkpatrick Memorial Park
Infrastructure
Construction
$1,160,000 CJ est. value
Lexington, NE 68850

East Viaduct Project - City Of Lexington
Infrastructure
Design
$9,600,000 CJ est. value
Lexington, NE 68850

RFQ Design - Veterans Pavilion at Kirpatrick Memorial Park
New Construction, Infrastructure
Post-Bid
$1,200,000 CJ est. value
Lexington, NE 68850

RFQ Design - Veterans Pavilion at Kirpatrick Memorial Park
New Construction, Infrastructure
Post-Bid
$1,200,000 CJ est. value
Lexington, NE 68850

Commerce Road Self-Storage
New Construction, Infrastructure - 73,000 SF
Design
$1,000,000 CJ est. value
Lexington, NE 68850

Commerce Road Self-Storage
New Construction, Infrastructure - 73,000 SF
Design
$1,000,000 CJ est. value
Lexington, NE 68850

Hudson Landing
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Gothenburg, NE 69138

2022 Sediment Augmentation Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Lexington, NE 68850

Cozad Community Schools High School and Elementary Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Cozad, NE 69130

Last Updated 02/16/2023 02:04 AM
Project Title

Lexington Racquet Center

Physical Address View project details and contacts
City, State (County) Lexington, NE 68850   (Dawson County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,659,200 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

https://lexch.com/news/tl-sund-awarded-bid-to-construct-lexington-racquet-center/article_a3941102-ad3b-11ed-830a-ff407d5e3ece.html TL Sund Constructors, Inc. was awarded the bid to construct the Lexington Racquet Center by the city council during their meeting on Tuesday, Feb. 14. There were six bids received by the City of Lexington and TL Sund had the low bid of $2,659,200.00. The city also requested an alternate bid for a concrete parking lot and TL Sund's bid was $283,800.00. City Manager Joe Pepplitsch said that the bids came in around 15 percent higher than the architect's estimate; he said this was reasonable given the increasing cost of materials. In total, the final construction costs may be 15 to 20 percent higher than estimates, but Pepplitsch said he could negotiate certain aspects of the build, such as the lighting package, that would help knock costs down at least seven percent. Pepplitsch said waiting to build the facility in the hope that the cost of materials to go down is not the best course of action. Mayor John Fagot said, "Waiting isn't in our favor," and the council members concurred. The substantial completion date would be fall of this year, with Nov. 6 as a rough target. TL Sund's plan would be to lay down the concrete first and then construct the building. Pepplitsch also noted TL Sund built the Lexington Field House, so there will be some continuity between the two facilities. The council approved TL Sund's base bid and alternate bid and gave Pepplitsch the ability to negotiate certain aspects of the construction. The next item on the agenda was for the council to consider its concurrence with a second change order for the St. Ann's Parish Center Community Development Block Grant project. Pepplitsch said there were additional American Rescue Plan (ARPA) funds available that the project could take advantage of and this change order was to reflect this. He noted there may be one more change order in the future to fully cover all the new available funds. The council gave its concurrence for the change order. Next was a resolution appointing a representative to the Lexington Area Solid Waste Agency Board. Pepplitsch noted that the group struggles to have quorums during their meetings and that council member Jeremy Roberts had volunteered to sit on the board. The council approved his appointment. The council was able to review the current Lexington Volunteer Fire Department membership roster. There are currently 41 volunteers on the LVFD roster, including 23 EMTs. Fire Chief - Bo Berry; Assistant Fire Chief - Dahlas Holbein; Rescue Chief - Doug Glaze; Assistant Rescue Chief - Al Copper; President Brad Worthing; Vice President Austin Roemmich and Secretary/Treasurer - Kristin Byrne. There were three new members added to the current roster as of Feb. 1, 2023, including Everardo Andablo, Luis Perez and Colton Vossler. They will go through a six month probationary trial period before they are eligible to be voted onto the department. Voting on the new members should take place at the LVFD regular meeting in August. The council approved the LVFD 2023 roster. Next on the agenda was an application for an addition to the liquor license held by Wilkinson Development, the owners of the Fat Dogs site in Lexington. Work on the expansion of the Fat Dogs site has been underway for the past several months. High volume diesel pumps will be added to the site, the tanks were moved to the location in August 2022 and the current building is being remodeled and expanded to provide a new restaurant and travel center. There were no new names added to the liquor license, but Wilkinson had to note where alcohol would be located in the new, expanded store. The council approved the addition to the license. The council also considered the sixth pay request from Lacy Construction for the Veterans Pavilion at Kirkpatrick Memorial Park project in the amount of $72,450.00. Pepplitsch noted construction on the pavilion has been moving along but the crews are waiting for better weather to do some additional paving. There have also been some portions of roofs going up on the facility. The council approved the pay requests. There was also a seventeenth pay request from Walters-Morgan Construction for the 2021 Wastewater Facility Improvements project in the amount of $249,422.10. Pepplitsch noted this project is getting slightly behind the timeline, mainly due to the weather, masonry work on the project and some staffing issues. Nonetheless, Pepplitsch said Walters-Morgan had earned this current pay request and the council approved. The council set a work session meeting for Saturday, March 4 at 8 a.m. to discuss some of the upcoming projects during the summer. For the last agenda item, the council voted to enter executive session at 5:47 p.m. to discuss real estate negotiations. The council took no official action after the closed session was ended. _________________________________________________________________________________________________________________________________________________________________ The work includes but is not limited to the construction of a pre-engineered metal building structure approx. 31,000 sf including tennis courts, reception area, space for spectator seating, restrooms, storage/mechanical, a non-occupiable mezzanine and site/civil items.

Details

31,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 27 - Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents